| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 86 15 spaces, 8 video rooms; 1 space set per project | 96 | 10 to spare |
| Access ports | 104 86 + 20% headroom | 144 | 40 to spare |
| Access switches | 3 48 ports each | 3 | Exactly enough |
| PoE budget | 304 W 18 devices as the vendors state; 10 PoE devices with no figure | 2160 W | 1856 W to spare |
| Rack space | 42U 21U of parts + 25% growth | 42U | Exactly enough |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Locations is switched off
Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.
Health of each space now. Simulated.
- Meeting rooms
- Reception
- Pantry and café
- Print and storage
- Town hall
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
- Meeting rooms
- Focus, huddle and offices
- Pantry and café
- Print and storage
- Flex desks
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
- Meeting rooms
- Focus, huddle and offices
- Pantry and café
- Print and storage
- Flex desks
- Assigned desks
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
Key Health
- WorkingNothing wrong now; shaded darker while in use
- Not working nowA unit offline or alerting, or an open incident
- ClosedOutside the office's hours; no ring
- FaultA P1 to P3 incident someone is on, or nobody has yet
- To reviewA P4, or a job waiting on something outside
- Work bookedA task or a device swap, no incident
- No open jobsNothing open in the space
- FaultA switch port serving the space is down or draws no power
- To reviewA switch port serving it is off the VLAN plan, or a cable passed its test with little margin
- FineEvery port up; its access point in service
- Not recordedNo switch port recorded for the space
- PlannedIn a project that has not reached the space yet
- Being installedThe new kit is going in now
- Snag openInstalled, with a snag still open
- Handed overDone and handed over
- CoveredA vendor covers the kit; the contract runs past 90 days
- To reviewThe covering contract ends within 90 days
- Not coveredNo vendor recorded for the kit
- Guides and fixesSetup guides or captured fixes cover the kit
- Known errorA manufacturer's known error affects a unit here
- Guide past dueA setup guide is past due for review (dashed)
- Nothing recordedNo guide, known error or captured fix yet
Replay
NowSimulated. Frames are drawn still; Play steps them one by one. Space pauses, ← and → step, Now goes back to live.
Internet
- Carrier OnePrimary · Dedicated internet access over fibre, handed off as Ethernet · 2 Gb/s symmetric
- Carrier TwoBackup · Dedicated internet access over fibre, handed off as Ethernet · 1 Gb/s symmetric
Comms rooms
- 20.14 Comms room (MDF) Enough for the spaces it serves
- 21.23 Comms room (IDF) Enough for the spaces it serves
- 22.22 Comms room (IDF) Enough for the spaces it serves
IT store
- 20.30 IT store35 spare units · 4 counted lines
- 2 below minimumLast counted 13 Oct 2026
Next two weeks
- Board room screens blank, meeting at 1019 Oct · Incident
- Replace 119 devices due in 202619 Oct · Work plan
- Provision Curlew's new video bar: asset record, DNS, device management and monitoring21 Oct · Project task
- Install the new video bar in Curlew23 Oct · Project task
Spaces by floor
60 spacesAll 63 spaces in Spaces →Level 20 15 spaces
Level 21 23 spaces
Level 22 22 spaces
Comms rooms and racks
Cables at New York office →| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 212 23 spaces, 64 desks, 11 video rooms | 240 | 28 to spare |
| Access ports | 255 212 + 20% headroom | 288 | 33 to spare |
| Access switches | 6 48 ports each | 6 | Exactly enough |
| PoE budget | 476 W 20 devices as the vendors state; 9 PoE devices with no figure | 4320 W | 3844 W to spare |
| Rack space | 42U 28U of parts + 25% growth | 42U | Exactly enough |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 190 22 spaces, 56 desks, 9 video rooms; 1 space set per project | 192 | 2 to spare |
| Access ports | 228 190 + 20% headroom | 240 | 12 to spare |
| Access switches | 5 48 ports each | 5 | Exactly enough |
| PoE budget | 312 W 17 devices as the vendors state; 7 PoE devices with no figure | 3600 W | 3288 W to spare |
| Rack space | 42U 24U of parts + 25% growth | 42U | Exactly enough |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
Internet circuits
Restricted: internet circuits Follow them in 3D2 circuits: 2 Gb/s primary, 1 Gb/s backup · Carrier Two renews in 4 months
Carrier One
Primary2 Gb/s symmetric
- Circuit ID
- C1-NYC-0040917
- Service level
- 99.95% available, restored within 4 hours, 24/7
- Support
- Carrier One service desk, 24/7; account C1-ACC-40702
- Contract
- Renews 21 Jul 2027, 36-month term
- Kind
- Dedicated internet access over fibre, handed off as Ethernet
Carrier details are demo values Demo value. The carrier's phone number is kept in the paging tool, not here.
Carrier Two
Backup1 Gb/s symmetric
- Circuit ID
- C2-NYC-0218836
- Service level
- 99.9% available, restored within 8 hours, 24/7
- Support
- Carrier Two network operations centre, 24/7; account C2-ACC-88390
- Contract
- Renews in 4 months (21 Feb 2027), 24-month term
- Kind
- Dedicated internet access over fibre, handed off as Ethernet
Carrier details are demo values Demo value. The carrier's phone number is kept in the paging tool, not here.
Open work and incidents
Projects 1
- New York office video bar refreshPRJ-12 · AV refresh · Deploy
Incidents 1
- Board room screens blank, meeting at 10P2 INC0041188 · In progress · 20.10 Whooper Swan
Vendors and visits
Vendors 1
- Northlight AVIntegration
Visits 0
No visits booked.
Hours and change window
Open 07:00 to 19:00, Monday to Friday · next change window tomorrow, 21:00 to 01:00
Office hours
07:00 to 19:00
Monday to Friday, New York time. Displays and signage turn on at opening and off an hour after closing.
Hours and window are demo values Demo value.
Facts
- Kind
- Headquarters
- Where
- New York, United States
- Region
- Americas
- Time zone
- America/New_York
- Floors
- Level 20, Level 21, Level 22
- Spaces
- 54 spaces, 120 desks, 3 comms rooms
- Devices
- 395 units
- Mains
- 120 V, 60 Hz, plug A, B
- On-site technician
- Carlos Mendes, Elena Vasquez
- 3D model
- Modelled: every floor, comms room, cable run and circuit