Comms roomNYCNew York office · Level 20: welcome and meeting floorBeing installedUniFi standard

20.14 Comms room (MDF)

UniFi standard · no open incidentschecked just now

Restricted: rack and switch ports

  • Patching
  • Switching
  • Internet edge
  • Management
  • Power
  • Free space

42U · 25U used, 17U free

  1. U42: Fibre patch, Corning Closet Connector Housing, 1U
  2. U30 to U41: Space for growth
  3. U29: Out-of-band router, cellular, ZPE Nodegrid Gate SR
  4. U28: Out-of-band console server, ZPE Nodegrid Serial Console Plus, 48 ports
  5. U25: Internet circuit handoffs, two providers, ADVA FSP 150-GE114Pro
  6. U24: Gateway B, Ubiquiti UniFi Enterprise Firewall (EFG), Being installed
  7. U23: Gateway A, Ubiquiti UniFi Enterprise Firewall (EFG), Being installed
  8. U21: Core switch B, Ubiquiti UniFi Switch Pro Aggregation, Being installed
  9. U20: Core switch A, Ubiquiti UniFi Switch Pro Aggregation, Being installed
  10. U17: Access switch 3, Level 20, Ubiquiti UniFi Switch Pro Max 48 PoE
  11. U16: Access switch 2, Level 20, Ubiquiti UniFi Switch Pro Max 48 PoE
  12. U15: Access switch 1, Level 20, Ubiquiti UniFi Switch Pro Max 48 PoE, Being installed
  13. U12: Fibre patch, floor riser, Corning Closet Connector Housing, 1U
  14. U9 to U10: Patch panel B, Level 20, Panduit NetKey Cat6A patch panel, 48 ports
  15. U6 to U7: Patch panel A, Level 20, Panduit NetKey Cat6A patch panel, 48 ports
  16. U3 to U4: UPS battery pack
  17. U1 to U2: UPS, APC Smart-UPS SRT 3000VA, 2U

Rack space

17U free of 42U

25U used.

Needs 42U for what it serves: exactly enough.

Access ports

58 free of 144

  • Access switch 3, Level 200 of 48
  • Access switch 2, Level 2044 of 48
  • Access switch 1, Level 2042 of 48
  • Outlets patched86 of 96

Needs 104 (86 + 20% headroom): 40 to spare.

PoE 720W total PoE availability on each of 3, as the vendor states. The draw is not measured.

Power

APC Smart-UPS SRT 3000VA, 2U, with a battery pack

  • FeedsA and B
  • Load and runtime46%, 24 min

2 power strips at the back: Raritan PX3 monitored rack PDU.

Circuits: A from DB-20A, way 12; B from DB-20B, way 14.

Internet and uplinks

Out-of-band: out-of-band router, cellular (ZPE Nodegrid Gate SR); out-of-band console server (ZPE Nodegrid Serial Console Plus, 48 ports).

Power and temperature

Against the power and racks standards

UPS runs 24 min at 46% load, inside the standard · the room is at 21.5 °C

UPS runtime · APC Smart-UPS SRT 3000VA, 2U

24 min at least 15

UPS load

46% at most 80%

Temperature Simulated

21.5 °C 18 to 27

Runtime and load as measured at the last timed test, 9 Dec 2025 Demo value. Temperature from the temperature probe on the UPS network card, at the front of the rack, reporting to monitoring; live readings come by connector.

If this were off

Simulated

Pick a switch, gateway or circuit here to see which spaces, meetings and services would lose the internet. Worked out from the recorded patching.

Take off

Gateway B Ubiquiti UniFi Enterprise Firewall (EFG) · Rack 1, U24 · 20.14 Comms room (MDF)

Would affect nothing: Gateway A carries every space

  • Level 20: welcome and meeting floor

  • Level 21

  • Level 22

Would be affected: a projection, not a fault Keeps workingRestricted: floor plan

Spaces it would cut off 0

  • None: Gateway A carries every space.

VLANs at the New York office

9 VLANs · 2 ports to review
  • To reviewnyc-2014-as02 port 37 · Printer · nyc-2013-prn01, 20.13 Copy and printPlanned VLAN 70 Printers, seen VLAN 20 Corporate on the switch.
  • To reviewnyc-2004-sw01 LAN 9 · Switch nyc-2014-as01 port 16, 20.04 HeronPlanned tagged 30, seen tagged 30 and 40: VLAN 40 AV leaves the room.

Switches here nyc-2014-cs01Core switch Anyc-2014-cs02Core switch Bnyc-2014-as01Access switch 1nyc-2014-as02Access switch 2nyc-2014-as03Access switch 3

In-room switches nyc-2004-sw0120.04 Heronnyc-2010-sw0120.10 Whooper Swannyc-2105-sw0121.05 Skylarknyc-2201-sw0122.01 Corncrake

VLANPrefixGatewayAddressesReachesPorts
10 Management10.10.10.0/2410.10.10.139 reservationsreserved 10.10.10.20 to 10.10.10.219 · pool 10.10.10.220 to 10.10.10.254Only the network team's tools and the controller91
20 Corporate10.10.20.0/2210.10.20.1None reservedreserved 10.10.20.20 to 10.10.20.219 · pool 10.10.21.1 to 10.10.23.254Internal services and the internet102
30 Room systems10.10.30.0/2410.10.30.156 reservationsreserved 10.10.30.20 to 10.10.30.219 · pool 10.10.30.220 to 10.10.30.254Their cloud services, device management and the booking service60
31 Displays and signage10.10.31.0/2410.10.31.151 reservationsreserved 10.10.31.20 to 10.10.31.219 · pool 10.10.31.220 to 10.10.31.254The display and signage management platforms, NTP and the room control system51
40 AV169.254.0.0/16None: not routedLink-local, in each roomNothing outside the room (not routed)4
50 Building10.10.50.0/2410.10.50.11 reservationreserved 10.10.50.20 to 10.10.50.219 · pool 10.10.50.220 to 10.10.50.254The building management platform only1
60 Security10.10.60.0/2410.10.60.12 reservationsreserved 10.10.60.20 to 10.10.60.219 · pool 10.10.60.220 to 10.10.60.254The security platforms only2
70 Printers10.10.70.0/2410.10.70.13 reservationsreserved 10.10.70.20 to 10.10.70.219 · pool 10.10.70.220 to 10.10.70.254The print service3
90 Guest10.10.90.0/2310.10.90.1None reservedpool 10.10.90.20 to 10.10.91.254The internet only, clients cannot see each other0

From the network standard's VLAN plan. Prefixes, gateways and addresses are made up for the demo; the ports are as recorded for the demo, as the switch platforms would report them.

Incidents

No incidents recorded for this space.

All incidents at New York office

Compared against

Main comms room (MDF)

UniFi: Two UniFi Enterprise Firewalls in Shadow Mode (they also run the UniFi Network application), two UniFi Pro Aggregation core switches, a UniFi Pro Max 48 PoE access switch for the floor, an out-of-band console server and cellular router, fibre and copper patching, on a UPS with power strips on two feeds.

Network standard
UniFi
Required devices
All recorded

Lifecycle

Being installed
5

Upkeep

Room checks from the maintenance planner

Next check: Thu, 29 Oct

Sized for what it serves

15 spaces, 8 video rooms · How a comms room is sized
  1. Data outlets8615 spaces, 8 video rooms; 1 space set per project96panel ports10 to spare
  2. Access ports10486 + 20% headroom144on 3 switches40 to spare
  3. Access switches348 ports each3Exactly enough
  4. PoE budget304 W18 devices as the vendors state; 10 PoE devices with no figure2160 Was the vendor states1856 W to spare
  5. Rack space42U21U of parts + 25% growth42UExactly enough
  6. UPSNot sizedload and runtime not recordedAPC Smart-UPS SRT 3000VA, 2Uin the rackNot checked

Patching

152 cables in 34 runs, coloured by the house cable standard · All cables at New York office

Restricted: rack and switch ports

Spaces it serves

60 spaces

Notes

  • The rack also holds access switches 2 and 3. The main comms room space type gives the floor one access switch position, so they are counted from the rack.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 20.14 Comms room (MDF), New York office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.