Access switch for the Dublin office IDFs
Pre-stage and test the configuration for PRJ-16 before the cutover weekend, with every AV device type on the floors plugged in.
Raised by Declan MooreWith Marco Bianchi
0 of 3 checks passed
- Configuration loads from the port map
- Every AV device type gets power and its VLAN
- Video bar, controller and scheduler panel pass verification
No decision yet. Waiting for bench time.