Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Projects is switched off

Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.

Organisation settings

Project PRJ-15Custom designDublin officeSimulated

Dublin office divisible town hall

Design gate due 13 Nov · 1 task waiting on somethingchecked just now

ScheduleOn planDesign is due 13 Nov; target 19 Mar.
Cost€0 in hand€128,000 spent or ordered of €235,000 approved, €107,000 still estimated.
ScopeAs chartered2 spaces, custom design; no change requests.
Next gateDesign gatedue 13 NovService manager, AV signs it off. Design signed off. Lab tests passed.

Timeline

22 Sept to 19 Mar, following the Custom room design playbook, version 1.1

PlannedActualPast the planGate, filled when signed off

Design: what happened

Open, due 13 Nov

Draft design and signal routes under way; partition sensor in the Lab.

The gate, signed off by Service manager, AV

  • Design signed off
  • Lab tests passed
What the playbook says: 4 steps
  1. AV and IT delivery engineerCustom design and signal routes
  2. Innovation engineerTest anything new in the Lab
  3. Service manager, AVCheck the design against the house standard
  4. Integration vendorVendor site survey and a review of the design

Spaces

People and time

TVTomás VargaProgramme manager3 of 10 h · Holds the budget and the landlord conversation
RKRuth KellyProject manager9 of 50 h · Runs dates, facilities and the moving-wall contractor
ABAnna ByrneLead engineer22 of 70 h · Designs the room and its split and join signal routes
NWNora WalshLab testing14 of 30 h · Tests the partition sensor and the joined-room audio in the Lab
LDLiam DoyleTechnician0 of 20 h · Checks the install and runs the verification
LFLena FischerVendor installer8 of 60 h · Details the design with Anna, then installs it
SRSofia ReyesService owner (sign-off)1 of 8 h · Signs off the custom design against the standard
Everyone's hours on the capacity plan

Budget

€235,000approved

Spent
€0
Ordered, not yet paid
€128,000
Still an estimate
€107,000
Left if all goes to plan
€0
Every project's budget
4 open of 5

Add a task

For work this project needs that the playbook does not list. It is added straight away, and you can undo it.

How should it count?

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About PRJ-15 Dublin office divisible town hall

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.