Task T-1301Design · Design phasePRJ-13 Toronto office video bar refreshDoneSimulated
Swap sheet for three rooms
Done · 5 steps completechecked just now
- 27 AugWas due 27 Aug
- 4 hEstimate
- 5/5Steps done
What to do
From the AV refresh playbook, Design phase: "Swap sheet per space: position, old model, new model, hostname kept", which produces: Swap sheet.
The phase is done when: Every swap is to the current standard; No change to space types or wiring.
The spaces
- 7.01 KestrelMedium meeting room
- 7.02 HeronSmall meeting room
- 7.03 CurlewHybrid meeting room