Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Build sheetBatch 7 of 8Project PRJ-14Simulated live
2.07 Flex desks A monitor
Every value recorded · 2 settings to set, 6 to checkchecked just now
Asset register
Assetbox › Assets- Asset tagAssetbox › Assets
The install recordAG-000487CheckThis unitSeen - Serial numberAssetbox › Assets
The install recordDEMO-JNU-000487CheckThis unitSeen - ModelAssetbox › Assets
The space typeDell UltraSharp 27 Thunderbolt Hub Monitor (U2724DE)CheckEvery unitSeen - LocationAssetbox › Assets
The spaceJuneau office, 2.07 Flex desks ASetThis unitSeen
Network pass-through
Monitor OSD- RJ45 (2.5GbE)Monitor OSD
The setup guide, the same on every unitPass-through only, active once the Thunderbolt upstream cable is connectedCheckEvery unitConfirm by hand
Input Source
Monitor OSD- Auto SelectMonitor OSD › Input Source › Auto Select
The setup guide, the same on every unitOn, Options for Thunderbolt set to Prompt for Multiple InputsSetEvery unitConfirm by hand - Reset Input SourceMonitor OSD
The setup guide, the same on every unitRun once at installCheckEvery unitConfirm by hand
Others
Monitor OSD- DDC/CIMonitor OSD › Others › DDC/CI
The setup guide, the same on every unitOn (vendor default)CheckEvery unitConfirm by hand
No setting matches these filters.