Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1502Design · Design phasePRJ-15 Dublin office divisible town hallDoingSimulated
Draft the custom design and its signal routes
Doing · due in 11 dayschecked just now
- 30 OctDue in 11 days
- 24 hEstimate
- 0/5Steps done
What to do
From the Custom room design playbook, Design phase: "Custom design and signal routes", which produces: Design.
The phase is done when: Design signed off; Lab tests passed.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.