Task T-1504Design · Design phasePRJ-15 Dublin office divisible town hallTo doSimulated
Check the design against the house standard
To do · due in 18 dayschecked just now
- 6 NovDue in 18 days
- 4 hEstimate
- 0/5Steps done
What to do
From the Custom room design playbook, Design phase: "Check the design against the house standard".
The phase is done when: Design signed off; Lab tests passed.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.