Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1501Design · Plan phasePRJ-15 Dublin office divisible town hallDoneSimulated
Agree how the room splits and joins
Done · 5 steps completechecked just now
- 2 OctWas due 2 Oct
- 4 hEstimate
- 5/5Steps done
What to do
From the Custom room design playbook, Plan phase: "Brief with the people who will use the room", which produces: Brief.
The phase is done when: Brief and budget agreed.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
Assign to