Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Locations is switched off

Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.

Organisation settings

Meeting roomDUBDublin office · Fifth floorIn service

5.05 Control room

All 2 units in service · no open incidentschecked just now

Plate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: sparePlate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: sparePlate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: sparePlate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: sparePlate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: sparePlate B: Wall plate on the wall below the table. 2 Type G sockets, 2 data ports. Power 1: touch controller Power 2: spare Data 1: The operator's controller, paired with the auditorium's codec over the network Data 2: sparePlate B: Wall plate on the wall below the table. 2 Type G sockets, 2 data ports. Power 1: touch controller Power 2: spare Data 1: The operator's controller, paired with the auditorium's codec over the network Data 2: sparePlate A: Wall plate behind the display. 2 Type G sockets, 2 data ports. Power 1: Monitoring display for the auditorium's programme and far end Power 2: spare Data 1: Monitoring display for the auditorium's programme and far end Data 2: sparePlate A: Wall plate behind the display. 2 Type G sockets, 2 data ports. Power 1: Monitoring display for the auditorium's programme and far end Power 2: spare Data 1: Monitoring display for the auditorium's programme and far end Data 2: spare1. Monitoring display for the auditorium's programme and far end, Samsung QM65C (65 in shown) · Display wall2. The operator's controller, paired with the auditorium's codec over the network, Poly TC10 · On the deskCharging cabinet for the demo kitAV rack: the auditorium codec, amplifier and switchesTrack behind the displayTray under the deskDown the desk legFloor cable coverSkirting trunkingSkirting trunkingPlate A: cabled up inside the wall to the ceiling above the door, back to the comms roomPlate B: cabled up inside the wall to the ceiling above the door, back to the comms roomPlate C: cabled up inside the wall to the ceiling above the door, back to the comms roomCat 6: Monitoring display for the auditorium's programme and far end LAN to plate A, data 1, via the track behind the displayPower: Monitoring display for the auditorium's programme and far end power to plate A, power 1, via the track behind the displayCat 6: The operator's controller LAN to plate B, data 1, via the desk tray, the desk leg, the floor cable cover and the skirting trunkingWhere the data comes in: above the door, from Comms room (IDF) 5.211. Monitoring display for the auditorium's programme and far end12. The operator's controller, paired with the auditorium's codec over the network2Plate C: Wall plate on the wall. 8 Type G sockets, 4 data ports. Power 1: charging cabinet Power 2: charging cabinet Power 3: charging cabinet Power 4: charging cabinet Power 5: spare Power 6: spare Power 7: spare Power 8: spare Data 1: demo kit staging Data 2: demo kit staging Data 3: spare Data 4: spareCPlate B: Wall plate on the wall below the table. 2 Type G sockets, 2 data ports. Power 1: touch controller Power 2: spare Data 1: The operator's controller, paired with the auditorium's codec over the network Data 2: spareBPlate A: Wall plate behind the display. 2 Type G sockets, 2 data ports. Power 1: Monitoring display for the auditorium's programme and far end Power 2: spare Data 1: Monitoring display for the auditorium's programme and far end Data 2: spareA

Drawn to scale · 6.40 × 5.00 m, 32 m² · 2 seats · Outlets: Type G sockets; UK and Ireland plates, 86 and 146 mm wide, 450 mm up to the centre (house default; the space type gives no height) · Operator desk for two facing the monitoring display, the AV rack and a charging cabinet (house choice)

Incidents

No incidents recorded for this space.

All incidents at Dublin office

Compared against

Control room (backstage AV)

Operator desk and AV rack: A 65 in monitoring display and a Poly TC10 for the operator, data and power for the AV rack, and a charging cabinet for the demo kit with its own outlets. The auditorium's codec, amplifier, AV switch and display transmitters stand in the AV rack here but are recorded with the auditorium. Lighting scenes for the auditorium are run from here through the building's lighting control; recording and streaming take the codec's feed here.

Required devices
All recorded
Wiring
Checks pass

Lifecycle

In service
2

Meeting platforms

The the operator's controller, paired with the auditorium's codec over the network is certified for Google Meet and Microsoft Teams Rooms

  • Poly TC10The operator's controller, paired with the auditorium's codec over the networkGoogle MeetMicrosoft Teams Rooms

Accessibility

Live captions and step-free access

Hearing loop
None in this room
Live captions
On in calls, from the touch panel
Step-free access
Yes
Last walked through
9 Jul 2026, by facilities, Dublin office, with the local AV technician

From the office's accessibility record (demo), the same one the room guide reads to people in the room.

Cable tests

Restricted: rack and switch ports

All 8 links passed certification · closest margin 3.5 dB · last tested 26 Jun 2026

LinkOutletCableLengthResultMarginTested
DUB-5.21-R1-U34-P02Behind the display, 1Cat6A54.92 mPass6.20 dB26 Jun 2026
DUB-5.21-R1-U34-P03Behind the display, 2Cat6A54.74 mPass6.42 dB26 Jun 2026
DUB-5.21-R1-U34-P04Wall, below the table, 1Cat6A54.2 mPass5.60 dB26 Jun 2026
DUB-5.21-R1-U34-P05Wall, below the table, 2Cat6A54.03 mPass3.98 dB26 Jun 2026
DUB-5.21-R1-U34-P06Wall, 1Cat6A53.14 mPass5.08 dB26 Jun 2026
DUB-5.21-R1-U34-P07Wall, 2Cat6A53.1 mPass3.72 dB26 Jun 2026
DUB-5.21-R1-U34-P08Wall, 3Cat6A53.11 mPass3.53 dB26 Jun 2026
DUB-5.21-R1-U34-P09Wall, 4Cat6A53.28 mPass4.78 dB26 Jun 2026

From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.

Room guide and QR

What people in the space see

The code on the table opens this space's guide: how to start a meeting and share a screen, and a two-tap way to report a problem or ask for something.

Sent from the guide

    Nothing sent from this space's guide yet. Reports appear here, on the Incidents board and on Home as they arrive.

    Outlets

    For this space
    ServiceWhereHow manyServesProvided by
    PowerBehind the display2monitoring display, spareIT
    DataBehind the display2monitoring display, spareIT
    DataWall, below the table2touch controller, spareIT
    PowerWall, below the table2touch controller, spareIT
    DataWall4demo kit staging, demo kit staging, spare, spareAt the charging cabinet, for setting up and updating demo kit before a briefingIT
    PowerWall8charging cabinet, charging cabinet, charging cabinet, charging cabinet, spare, spare, spare, spareIT

    Wiring

    0 signal cables, 3 to outlets
    DevicesMonitoring display for the auditorium's programme and far end, Samsung QM65CMonitoring display forthe auditorium's…Samsung QM65CNetwork, behind the display #1Network, behind the display #1Power, behind the display #1Power, behind the display #1The operator's controller, paired with the auditorium's codec over the network, Poly TC10The operator'scontroller, paired…Poly TC10Network, wall, below the desk #1Network, wall, below the desk …
    List every cable
    CableFromTo
    Cat 6Monitoring display for the auditorium's programme and far end, lan-1Data outlet 1, behind the display
    PowerMonitoring display for the auditorium's programme and far end, power-inPower outlet 1, behind the display
    Cat 6The operator's controller, paired with the auditorium's codec over the network, lan-1Data outlet 1, wall, below the tablePoE powers the controller

    View as

    See Keia Atlas the way someone else does. A demo: nobody signs in.

    Viewing asAnna ByrneAV and IT delivery engineer · EMEA

    Suggested

    Delivery

    • Delivery engineerDesigns and commissions spaces, from survey to handover
    • Project managerRuns projects day to day: dates, suppliers and who does what
    • On-site technicianInstalls and fixes kit in the offices
    • Programme managerPlans the year of projects across every region
    • Engineering managerLeads the delivery engineers
    • Project management leadLeads the project managers
    • On-site services managerLeads the on-site technicians
    • Delivery managerThe whole delivery team, every region

    Support and service

    • Service desk analystTakes incidents as they arrive and routes them
    • Network engineerPorts, VLANs and patching
    • Service manager, AVOwns the AV standard and its service
    • Service manager, networkOwns the network standard and its service

    The Lab

    • Innovation engineerTests new kit before it ships

    Leadership

    • Head of AV and ITThe whole service, every region

    Partners

    • Integration vendorSees their own installations only
    • Service vendorRepairs under the service contract

    Overview

    • EveryoneEvery role's first screen at once, to see the whole picture

    Settings

    Appearance
    LookStudio
    Text size
    Default

    Report

    Tell the team

    About 5.05 Control room, Dublin office

    Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.