| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 78 14 spaces, 8 video rooms; 1 space set per project | 96 | 18 to spare |
| Access ports | 94 78 + 20% headroom | 96 | 2 to spare |
| Access switches | 2 48 ports each | 2 | Exactly enough |
| PoE budget | 361 W 20 devices as the vendors state; 12 PoE devices with no figure | – | Not recorded |
| Rack space | 42U 20U of parts + 25% growth | 42U | Exactly enough |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Locations is switched off
Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.
Health of each space now. Simulated.
- Meeting rooms
- Reception
- Pantry and café
- Print and storage
- Town hall
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
- Meeting rooms
- Focus, huddle and offices
- Pantry and café
- Print and storage
- Flex desks
- Assigned desks
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
- Meeting rooms
- Breakout
- Corridors
- Stairs
- Lifts
- Toilets
- Riser
- Comms room
- Stores and ducts
Key Health
- WorkingNothing wrong now; shaded darker while in use
- Not working nowA unit offline or alerting, or an open incident
- ClosedOutside the office's hours; no ring
- FaultA P1 to P3 incident someone is on, or nobody has yet
- To reviewA P4, or a job waiting on something outside
- Work bookedA task or a device swap, no incident
- No open jobsNothing open in the space
- FaultA switch port serving the space is down or draws no power
- To reviewA switch port serving it is off the VLAN plan, or a cable passed its test with little margin
- FineEvery port up; its access point in service
- Not recordedNo switch port recorded for the space
- PlannedIn a project that has not reached the space yet
- Being installedThe new kit is going in now
- Snag openInstalled, with a snag still open
- Handed overDone and handed over
- CoveredA vendor covers the kit; the contract runs past 90 days
- To reviewThe covering contract ends within 90 days
- Not coveredNo vendor recorded for the kit
- Guides and fixesSetup guides or captured fixes cover the kit
- Known errorA manufacturer's known error affects a unit here
- Guide past dueA setup guide is past due for review (dashed)
- Nothing recordedNo guide, known error or captured fix yet
Replay
NowSimulated. Frames are drawn still; Play steps them one by one. Space pauses, ← and → step, Now goes back to live.
Internet
- Carrier OnePrimary · Dedicated internet access over fibre, handed off as Ethernet · 1 Gb/s symmetric
- Carrier TwoBackup · Dedicated internet access over fibre, handed off as Ethernet · 500 Mb/s symmetric
Comms rooms
- 3.21 Comms room (MDF) Enough for the spaces it serves
- 4.21 Comms room (IDF) Enough for the spaces it serves
- 5.21 Comms room (IDF) Enough for the spaces it serves
IT store
- 3.19 IT store21 spare units · 5 counted lines
- 2 below minimumLast counted 11 Oct 2026, a count is overdue
Next two weeks
- Partition sensor for a divisible roomUntil 25 Oct · Lab test
- Poly VideoOS 4.7.0 on the Studio X fleetUntil 1 Nov · Lab test
- Lab pass: every check in LAB-07 on the X52, X72, X32 and TC10, including a rollback to 4.6.2Until 30 Oct · Project task
- Booking panel outside Whooper Swan shows yesterday's meetingsUntil 19 Oct · Incident
Spaces by floor
41 spacesAll 44 spaces in Spaces →Third floor 14 spaces
Fourth floor 21 spaces
Fifth floor 6 spaces
Comms rooms and racks
Cables at Dublin office →| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 199 21 spaces, 68 desks, 8 video rooms | 240 | 41 to spare |
| Access ports | 239 199 + 20% headroom | 240 | 1 to spare |
| Access switches | 5 48 ports each | 5 | Exactly enough |
| PoE budget | 497 W 18 devices as the vendors state; 6 PoE devices with no figure | 3600 W | 3103 W to spare |
| Rack space | 42U 27U of parts + 25% growth | 42U | Exactly enough |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
| Sized for | Needs | Has | Verdict |
|---|---|---|---|
| Data outlets | 50 6 spaces, 3 video rooms | 96 | 46 to spare |
| Access ports | 60 50 + 20% headroom | 96 | 36 to spare |
| Access switches | 2 48 ports each | 2 | Exactly enough |
| PoE budget | 284 W 14 devices as the vendors state; 13 PoE devices with no figure | 1440 W | 1156 W to spare |
| Rack space | 24U 15U of parts + 25% growth | 42U | 18U to spare |
| UPS | Not sized load and runtime not recorded | APC Smart-UPS SRT 3000VA, 2U | Not checked |
Internet circuits
Restricted: internet circuits Follow them in 3D2 circuits: 1 Gb/s primary, 500 Mb/s backup · Carrier Two renews in 3 months
Carrier One
Primary1 Gb/s symmetric
- Circuit ID
- C1-DUB-0041270
- Service level
- 99.95% available, restored within 4 hours, 24/7
- Support
- Carrier One service desk, 24/7; account C1-ACC-40718
- Contract
- Renews in 6 months (21 Apr 2027), 36-month term
- Kind
- Dedicated internet access over fibre, handed off as Ethernet
Carrier details are demo values Demo value. The carrier's phone number is kept in the paging tool, not here.
Carrier Two
Backup500 Mb/s symmetric
- Circuit ID
- C2-DUB-0219044
- Service level
- 99.9% available, restored within 8 hours, 24/7
- Support
- Carrier Two network operations centre, 24/7; account C2-ACC-88412
- Contract
- Renews in 3 months (21 Jan 2027), 24-month term
- Kind
- Dedicated internet access over fibre, handed off as Ethernet
Carrier details are demo values Demo value. The carrier's phone number is kept in the paging tool, not here.
Open work and incidents
Projects 3
- Dublin office divisible town hallPRJ-15 · Custom design · Design
- Dublin office IDF switch refreshPRJ-16 · Comms room refresh · Procure
- Poly VideoOS 4.7.0 rolloutPRJ-22 · Firmware rollout · Plan
Incidents 4
- Video bar offline before the 09:00P2 INC0041210 · New · 3.09 Whooper Swan
- Can't start a call in Goldcrest, touch panel stuck on connectingP3 INC0041203 · New · 4.05 Goldcrest
- DNS rule unable to complete for Kestrel's video barP3 INC0041211 · New · 3.06 Kestrel
- Booking panel outside Whooper Swan shows yesterday's meetingsP4 INC0041172 · On hold · 3.09 Whooper Swan
Vendors and visits
Vendors 1
- Brightwave IntegrationIntegration
Visits 1
- Vendor walk-through, town hall24 Nov 2026
Hours and change window
Open 07:00 to 19:00, Monday to Friday · next change window Thursday 22 Oct, 22:00 to 02:00
Office hours
07:00 to 19:00
Monday to Friday, Dublin time. Displays and signage turn on at opening and off an hour after closing.
Hours and window are demo values Demo value.
Facts
- Kind
- Regional office
- Where
- Dublin, Ireland
- Region
- EMEA
- Time zone
- Europe/Dublin
- Floors
- Third floor, Fourth floor, Fifth floor
- Spaces
- 37 spaces, 68 desks, 3 comms rooms
- Devices
- 301 units
- Mains
- 230 V, 50 Hz, plug G
- On-site technician
- Liam Doyle
- 3D model
- Modelled: every floor, comms room, cable run and circuit