Out of service
Who was told Simulated from the booking system
Notes from the team
Drawn to scale · 3.05 × 3.66 m, 11.14 m² · 4 seats · Outlets: Type A, B sockets; US plates, 70 mm wide and 46 mm more a gang · Video bar above the display, camera at 59.25 in; storage 12 in deep
Compared against
Bring your own meeting: People run the meeting on their own laptop and use the room camera, microphones and speakers over USB.
- Required devices
- All recorded
- Wiring
- Checks pass
Lifecycle
- In service
- 2
Accessibility
Live captions and step-free access
- Hearing loop
- None in this room
- Live captions
- On in calls, from the touch panel
- Step-free access
- Yes
- Last walked through
- 30 Jul 2026, by facilities, New York office, with the local AV technicians
From the office's accessibility record (demo), the same one the room guide reads to people in the room.
Cable tests
Restricted: rack and switch portsAll 3 links passed certification · closest margin 3.4 dB · last tested 6 Oct 2026
| Link | Outlet | Cable | Length | Result | Margin | Tested |
|---|---|---|---|---|---|---|
| NYC-21.23-R1-U34-P04 | Behind the display, 1 | Cat6A | 29.74 m | Pass | 5.92 dB | 6 Oct 2026 |
| NYC-21.23-R1-U34-P05 | Behind the display, 2 | Cat6A | 29.5 m | Pass | 3.59 dB | 6 Oct 2026 |
| NYC-21.23-R1-U34-P06 | Behind the display, 3 | Cat6A | 29.72 m | Pass | 3.41 dB | 6 Oct 2026 |
From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.
Upkeep
Licences from the licence portals
One renews within 30 days
- Google Meet hardwareAmericas · renews 9 Nov 2026 (in 21 days)
Meeting quality from the meeting platform
94 out of 100 in the last 7 days
- Nine weeks
- 26 calls, none poorFrom Google Meet
Room guide and QR
What people in the space seeThe code on the table opens this space's guide: how to start a meeting and share a screen, and a two-tap way to report a problem or ask for something.
Sent from the guide
Nothing sent from this space's guide yet. Reports appear here, on the Incidents board and on Home as they arrive.
Outlets
For this space| Service | Where | How many | Serves | Provided by |
|---|---|---|---|---|
| Power | Behind the display | 4 | video bar, display, spare, spare | IT |
| Power | Wall, behind storage | 4 | For people in the room. A recommendation; facilities decide. | Facilities |
| Data | Behind the display | 3 | video bar, display, spare | IT |
Wiring
2 signal cables, 4 to outletsList every cable
| Cable | From | To |
|---|---|---|
| HDMI | Video bar, hdmi-out-1 | Display, hdmi-in-1 |
| USB-C | Video bar, usb-c-1 | Laptop |
| Cat 6 | Video bar, lan-1 | Data outlet 1, behind the display |
| Cat 6 | Display, lan-1 | Data outlet 2, behind the display |
| Power | Video bar, power-in | Power outlet 1, behind the display |
| Power | Display, power-in | Power outlet 2, behind the display |