Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Assets is switched off

Device types, units, models, setup guides, standards, IT stores and cables. This demo has the Assets module switched off in Organisation settings.

Organisation settings

SwitchCPH4.17 Comms room (MDF), Rack 1, U18Meraki dashboard · read 06:00Simulated

cph-417-cs01

6 ports in use, each on the VLAN the plan gives itchecked just now

The ports

Cisco Catalyst 9500-24Y4C · 28 ports
1102103104105–6–7–8–9–10–11–12–13–14–15–16–17–18–19–20–21–22–23–24–

Ports 25 to 28 · uplinks

25T26T27–28–
  • 10 Management
  • T Trunk: several VLANs, tagged
  • P Parked: patched, nothing plugged in
  • – Disabled: nothing patched

Restricted: rack and switch ports Recorded for the demo, as Meraki dashboard would report it. Select a port to open what is plugged into it.

Every port in use

6 in uses, 0 parked, 22 disabled
PortOn itModeVLANPlanChange
Port 1Switch cph-417-as01 port 49UplinkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned
Port 2Switch cph-417-as02 port 49UplinkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned
Port 3Switch cph-417-as03 port 49UplinkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned
Port 4Firewall ATrunkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned
Port 25Switch cph-417-cs02 port 25UplinkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned
Port 26Switch cph-417-cs02 port 26UplinkTrunk, tagged 20, 30, 31, 50, 60, 70, 90Planned VLAN 10 ManagementAs planned

Disabled, nothing patched: 5 to 24, 27 to 28.

If this were off

Simulated

What this switch would cut off, worked out from the recorded patching. Press a port to narrow it.

Core switch A Cisco Catalyst 9500-24Y4C · Rack 1, U18 · 4.17 Comms room (MDF)

Would affect nothing: Core switch B carries every space

  • Fourth floor

Would be affected: a projection, not a fault Keeps workingRestricted: floor plan
Its portsPressed ports are off; press one to keep it on and narrow the picture
UpUpUpUp56789101112131415161718192021222324UpUp2728

Restricted: rack and switch ports "Up" is an uplink: the way this switch reaches the internet.

Spaces it would cut off 0

  • None: Core switch B carries every space.

As recorded

NetBox's names
The switch's record, with every interface's cable trace
id: cph-417-cs01
rack: cph-4-17-r1
u: 18
platform: meraki
interfaces:
  - name: 1
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-13
      device: cph-417-as01
      interface: 49
  - name: 2
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-15
      device: cph-417-as02
      interface: 49
  - name: 3
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-17
      device: cph-417-as03
      interface: 49
  - name: 4
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-20
      device: AG-001593
  - name: 25
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-19
      device: cph-417-cs02
      interface: 25
  - name: 26
    enabled: true
    mode: tagged
    untagged_vlan: 10
    tagged_vlans:
      - 20
      - 30
      - 31
      - 50
      - 60
      - 70
      - 90
    connected:
      cables:
        - cph-cb-19
      device: cph-417-cs02
      interface: 26
disabled: 5-24,27-28

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About cph-417-cs01, Copenhagen office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.