Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Locations is switched off

Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.

Organisation settings

OfficeCPHEMEA--:-- local ·  Simulated live

Copenhagen office

1 space not working nowchecked just now

Lens

Health of each space now. Simulated.

Touchdown and breakoutWindow seatsBreakoutWindow seatsWindow seatsBreakoutSouth corridorNorth corridorWest linkEast linkStair ALift lobbyLifts 1 to 2Riser 1 (data)RiserCleaner's store and plantToilets and accessible toiletWCStair B (escape)StoreStoreStoreStoreStore4.01 Reception: 4.69 × 6.4 m (space type 6 × 5 m); Door on the front wall, 0.3 to 1.7 m; A column on the long wall, boxed in4.014.02 Pantry: 8.44 × 6.4 m (space type 8.5 × 6.55 m); Built the other way round; Door on the front wall, 6.74 to 8.14 m4.024.03 Heron: 4.1 × 6.4 m (space type 3.66 × 7.62 m); Built the other way round; Door on the front wall, 2.9 to 3.8 m4.034.04 Curlew: 4.1 × 6.4 m (space type 3.66 × 7.62 m); Door on the front wall, 2.9 to 3.8 m4.044.05 Gannet: 3.28 × 6.4 m (space type 3.66 × 6.1 m); Door on the front wall, 2.08 to 2.98 m4.054.06 Kestrel: 3.49 × 6.4 m (space type 3.66 × 6.1 m); Built the other way round; Door on the front wall, 2.29 to 3.19 m4.064.07 Peregrine: 5.2 × 6.4 m (space type 6.6 × 5.2 m); Door on the front wall, 4 to 4.9 m4.074.08 Barn Owl: 3.52 × 6.4 m (space type 5.5 × 4.22 m); Door on the front wall, 0.3 to 1.2 m4.084.09 Wren: 2.79 × 4 m (space type 3.05 × 3.66 m)4.094.10 Robin: 2.87 × 4 m (space type 3.05 × 3.66 m); Built the other way round4.104.11 Goldcrest: Built the other way round; Door on the front wall, 1.52 to 2.37 m; A structural column in the corner4.114.12 Focus 4.12: Door on the front wall, 0.3 to 1.15 m4.124.13 Focus 4.13: Door on the front wall, 1.29 to 2.14 m4.134.14 Copy and print: Door on the front wall, 0.3 to 1.18 m; A glass wall to the corridor: no wall plates on that side4.144.15 Flex desks A: Data comes in on the front wall4.154.16 Flex desks B: Data comes in on the back wall4.164.17 Comms room (MDF): Door on the back wall, 2.6 to 3.5 m4.174.18 IT store: Door on the front wall, 0.3 to 1.2 m4.18Ladder in the comms room: 129 cables of 407South corridor tray, west: 69 cables of 108South corridor tray, east: 59 cables of 81West link tray: 25 cables of 54East link tray: 28 cables of 54North corridor tray, west: 20 cables of 54North corridor tray, middle: 23 cables of 54North corridor tray, east: 10 cables of 54Branch to 4.01 Reception: 4 cables of 54Branch to 4.02 Pantry: 4 cables of 54Branch to 4.03 Heron: 7 cables of 54Branch to 4.04 Curlew: 7 cables of 54Branch to 4.05 Gannet: 7 cables of 54Branch to 4.06 Kestrel: 7 cables of 54Branch to 4.07 Peregrine: 8 cables of 54Branch to 4.08 Barn Owl: 7 cables of 54Branch to 4.09 Wren: 6 cables of 54Branch to 4.10 Robin: 3 cables of 54Branch to 4.11 Goldcrest: 3 cables of 54Branch to 4.12 Focus 4.12: 2 cables of 54Branch to 4.13 Focus 4.13: 2 cables of 54Branch to 4.14 Copy and print: 2 cables of 54Branch to 4.15 Flex desks A: 40 cables of 54Branch to 4.16 Flex desks B: 16 cables of 54Branch to 4.18 IT store: 0 cables of 54Branch to access point cph-4-ap01: 1 cables of 54Branch to access point cph-4-ap02: 1 cables of 54Branch to access point cph-4-ap03: 1 cables of 54Riser 1 (data)Rack 1cph-4-ap01, U7 Procph-4-ap02, U7 Procph-4-ap03, U7 Pro5 m
  • Meeting rooms
  • Focus, huddle and offices
  • Reception
  • Pantry and café
  • Print and storage
  • Flex desks
  • Breakout
  • Corridors
  • Stairs
  • Lifts
  • Toilets
  • Riser
  • Comms room
  • Stores and ducts
Restricted: floor plan Fictional floor plan: space sizes from the space types; layout, trays and cable lengths made up for the demo.
Key Health
  • WorkingNothing wrong now; shaded darker while in use
  • Not working nowA unit offline or alerting, or an open incident
  • ClosedOutside the office's hours; no ring

Internet

  • Carrier OnePrimary · Dedicated internet access over fibre, handed off as Ethernet · 500 Mb/s symmetric
Circuit IDs and support ↓

Comms rooms

Racks and sizing ↓

IT store

Open the IT store →

Spaces by floor

18 spacesAll 19 spaces in Spaces →

Comms rooms and racks

Cables at Copenhagen office →
4.17 Comms room (MDF)Main comms room (MDF) · Rack 1, 24UOlder kit, refresh 2027
Sized forNeedsHasVerdict
Data outlets125 18 spaces, 28 desks, 9 video rooms14419 to spare
Access ports150 125 + 20% headroom144Short by 6
Access switches4 48 ports each3Short by 1
PoE budget216 W 11 devices as the vendors state; 10 PoE devices with no figure–Not recorded
Rack space42U 25U of parts + 25% growth24UShort by 18U
UPSNot sized load and runtime not recordedAPC Smart-UPS SRT 3000VA, 2UNot checked

Internet circuits

Restricted: internet circuits Follow them in 3D

One circuit: 500 Mb/s primary · Carrier One ended 21 May 2026

Carrier One

Primary

500 Mb/s symmetric

Circuit ID
C1-CPH-0043102
Service level
99.95% available, restored within 4 hours, 24/7
Support
Carrier One service desk, 24/7; account C1-ACC-40788
Contract
Ended 21 May 2026 (21 May 2026), 24-month term
Kind
Dedicated internet access over fibre, handed off as Ethernet

Carrier details are demo values Demo value. The carrier's phone number is kept in the paging tool, not here.

Open work and incidents

Projects 1

Incidents 1

Vendors and visits

Hours and change window

Open 07:00 to 19:00, Monday to Friday · next change window Wednesday 21 Oct, 22:00 to 02:00

Office hours

07:00 to 19:00

Monday to Friday, Copenhagen time. Displays and signage turn on at opening and off an hour after closing.

Change window

22:00 to 02:00

Every Wednesday, running into the next morning. Firmware, switch and Wi-Fi changes that could interrupt a meeting happen here, as the network and Wi-Fi standards ask. Next: Wednesday 21 Oct, 22:00 to 02:00.

Hours and window are demo values Demo value.

Facts

Kind
Office
Where
Copenhagen, Denmark
Region
EMEA
Time zone
Europe/Copenhagen
Floors
Fourth floor
Spaces
16 spaces, 28 desks, 1 comms room
Devices
118 units
Mains
230 V, 50 Hz, plug C, E, F, K
On-site technician
None; covered from another office
3D model
Modelled: every floor, comms room, cable run and circuit

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Copenhagen office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.