Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Assets is switched off
Device types, units, models, setup guides, standards, IT stores and cables. This demo has the Assets module switched off in Organisation settings.
In-room switchDUB5.02 BoardroomNETGEAR Engage · read 06:00Simulated
dub-502-sw01
6 ports in use, each on the VLAN the plan gives itchecked just now
The ports
Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD) · 11 ports- 10 Management
- 30 Room systems
- 40 AV
- X 802.1X · M MAC check (MAB)
- P Parked: patched, nothing plugged in
- – Disabled: nothing patched
Restricted: rack and switch ports Recorded for the demo, as NETGEAR Engage would report it. Select a port to open what is plugged into it.
Change VLAN
Every port in use
6 in uses, 0 parked, 5 disabled| Port | On it | Mode | VLAN | Plan | Change |
|---|---|---|---|---|---|
| LAN 1 | Video codec · dub-502-vc01Its LAN 1 · The switch powers the codec (PoE+) | AccessMAC check (MAB) | Planned VLAN 30 Room systems | As planned | |
| LAN 2 | Video codec · dub-502-vc01Its LAN 2 · Link-local network for Poly IP peripherals | AccessMAC check (MAB) | Planned VLAN 40 AV | As planned | |
| LAN 3 | Microphone 1Its LAN 1 | AccessMAC check (MAB) | Planned VLAN 40 AV | As planned | |
| LAN 4 | Microphone 2Its LAN 1 | AccessMAC check (MAB) | Planned VLAN 40 AV | As planned | |
| LAN 5 | Amplifier · dub-502-amp01Its LAN 1 | AccessMAC check (MAB) | Planned VLAN 30 Room systems | Not in the plan | |
| LAN 9 | Switch dub-521-as01 port 10Uplink through Wall outlet A3 | Trunk, tagged 30 | Planned VLAN 10 Management | As planned |
Disabled, nothing patched: LAN 6, LAN 7, LAN 8, SFP 1, LAN 10.
If this were off
SimulatedThe space this switch serves.
5.02 Boardroom Dublin office
Would affect 1 space, 6 meetings in the next 24 hours (72 people) and 1 service
Third floor
Fourth floor
Fifth floor
Restricted: rack and switch ports "Up" is an uplink: the way this switch reaches the internet.
Spaces it takes off 1
- 5.02 BoardroomFloor 5 · 16 units · 6 bookings
As recorded
NetBox's namesThe switch's record, with every interface's cable trace
id: dub-502-sw01
space: dub-5-02
position: network-switch
platform: netgear
interfaces:
- name: lan-1
enabled: true
mode: access
untagged_vlan: 30
auth: mab
connected:
device: AG-004017
interface: lan-1
- name: lan-2
enabled: true
mode: access
untagged_vlan: 40
auth: mab
connected:
device: AG-004017
interface: lan-2
- name: lan-3
enabled: true
mode: access
untagged_vlan: 40
auth: mab
connected:
device: AG-004020
interface: lan-1
- name: lan-4
enabled: true
mode: access
untagged_vlan: 40
auth: mab
connected:
device: AG-004021
interface: lan-1
- name: lan-5
enabled: true
mode: access
untagged_vlan: 30
auth: mab
connected:
device: AG-004022
interface: lan-1
- name: lan-9
enabled: true
mode: tagged
untagged_vlan: 10
tagged_vlans:
- 30
connected:
cables:
- DUB-5.21-R1-U38-P10
- dub-cb-63
device: dub-521-as01
interface: 10
disabled:
- lan-6
- lan-7
- lan-8
- sfp-1
- lan-10