Task T-1207Install · Deploy phasePRJ-12 New York office video bar refreshTo doSimulated
Swap the X72 in Skylark
To do · due in 25 dayschecked just now
- 13 NovDue in 25 days
- 6 hEstimate
- 0/5Steps done
What to do
From the AV refresh playbook, Deploy phase: "When a vendor does the swap: record serial and MAC for each position, with a label photo".
The phase is done when: Every space in the batch installed; Every space passes, or its snags are accepted.
The space
- 21.05 SkylarkHybrid meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.