Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1303Network · Procure phasePRJ-13 Toronto office video bar refreshDoneSimulated
Reserve addresses by MAC before delivery
Done · 4 steps completechecked just now
- 25 SeptWas due 25 Sept
- 2 hEstimate
- 4/4Steps done
What to do
From the AV refresh playbook, Procure phase: "Send MACs to the network team for address reservations before delivery".
The phase is done when: Everything received; Addresses reserved.
The spaces
- 7.01 KestrelMedium meeting room
- 7.02 HeronSmall meeting room
- 7.03 CurlewHybrid meeting room
Assign to