Task T-1601Survey · Plan phasePRJ-16 Dublin office IDF switch refreshDoneSimulated
Audit every port in both IDFs
Done · 4 steps completechecked just now
- 2 OctWas due 2 Oct
- 12 hEstimate
- 4/4Steps done
What to do
The phase is done when: Scope and window agreed; Change request raised.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
- 4.05 GoldcrestHuddle room, sofa
Assign to
How it closed
"Export the switch's port descriptions before the audit; half the AV ports were already labelled with the room name."