Task T-1604Design · Design phasePRJ-16 Dublin office IDF switch refreshDoingSimulated
List every AV device's port and VLAN
Doing · due in 11 dayschecked just now
- 30 OctDue in 11 days
- 4 hEstimate
- 0/5Steps done
What to do
From the Comms room refresh playbook, Design phase: "List every AV device affected and how to check it", which produces: AV re-verification list.
The phase is done when: Port map and rollback plan approved; AV devices listed.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
- 4.05 GoldcrestHuddle room, sofa