Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1605Network · Deploy phasePRJ-16 Dublin office IDF switch refreshTo doSimulated
Label ports before the cutover
To do · due in 46 dayschecked just now
- 4 DecDue in 46 days
- 6 hEstimate
- 0/4Steps done
What to do
From the Comms room refresh playbook, Deploy phase: "When a vendor racks the equipment: record serial and MAC for each unit, with a label photo".
The phase is done when: Every port moved and up; Every device back and monitored.
The spaces
- 3.04 CurlewLarge meeting room
- 3.09 Whooper SwanHybrid meeting room
- 4.05 GoldcrestHuddle room, sofa
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.