Project PRJ-18Custom designTokyo officeSimulated
Tokyo office hybrid meeting rooms
Design gate due 30 Oct · 3 open tasks, none waitingchecked just now
Timeline
14 Sept to 16 Apr, following the Custom room design playbook, version 1.1PlannedActualPast the planGate, filled when signed off
Plan: what happened
Ended 25 Septon time
Two rooms; Northlight AV chosen for install.
Handed onScope
Gate signed off by Tomás Varga, 25 Sept
Tasks in this phase
Survey both rooms and the ceilingKenji Sato · DoneThe gate, signed off by Programme manager
- Brief and budget agreed
What the playbook says: 2 steps
- Project managerBrief with the people who will use the room
- AV and IT delivery engineerPick the space types it builds on
Design: what happened
Open, due 30 Oct
Draft design shared; waiting on a ceiling survey for microphone positions.
Tasks in this phase
Draft the design and signal routesMei Tan · DoingVendor site survey and design reviewSam Okafor · To doDesign sign-offSofia Reyes · To doThe gate, signed off by Service manager, AV
- Design signed off
- Lab tests passed
What the playbook says: 4 steps
- AV and IT delivery engineerCustom design and signal routes
- Innovation engineerTest anything new in the Lab
- Service manager, AVCheck the design against the house standard
- Integration vendorVendor site survey and a review of the design
Procure: what happened
Not reached yet. Planned to end 10 Jan (the playbook allows 4 to 8 weeks).
Tasks in this phase
None recorded.
The gate, signed off by Project manager
- Everything ordered
What the playbook says: 1 step
- Project managerOrders, including building works
Deploy: what happened
Not reached yet. Planned to end 11 Mar (the playbook allows 4 to 6 weeks).
Tasks in this phase
None recorded.
The gate, signed off by AV and IT delivery engineer
- Installed to the design
- Every mode passes
What the playbook says: 6 steps
- Integration vendor · ProvisionVendor installs to the design; record serial and MAC for each position, with a label photo
- Project manager · InstallBuilding works
- On-site technician · InstallInstall to the design
- Integration vendor · ConfigureVendor tunes microphones and cameras with the delivery engineer on a test call
- AV and IT delivery engineer · CommissionVerification in every mode the room has
- Project manager · CommissionTrial week with the people who use it
Hand over: what happened
Not reached yet. Planned to end 23 Mar (the playbook allows 1 weeks).
Tasks in this phase
None recorded.
The gate, signed off by Service manager, AV
- Records and guide complete
What the playbook says: 3 steps
- AV and IT delivery engineerOne-page guide for the room
- Project managerHandover to the service desk
- Integration vendorAs-built drawings and control programming files from the vendor
Closed: what happened
Not reached yet. Planned to end 16 Apr (the playbook allows - weeks).
Tasks in this phase
None recorded.
The gate, signed off by Programme manager
- Decision recorded
What the playbook says: 1 step
- Service manager, AVDecide whether this should become a space type
Spaces
People and time
Budget
JP¥14,500,000approved
- Spent
- JP¥0
- Ordered, not yet paid
- JP¥0
- Still an estimate
- JP¥14,500,000
- Left if all goes to plan
- JP¥0
To do2
Doing1
Waiting on0
Done1
Archived tasks 0
Assign to
Risks (might happen), issues (have happened), decisions and dependencies, in one place. Open first.
No risks, issues, decisions or dependencies on record for this project.
A change to what the project delivers. Anyone on the project can propose one; the approver decides, and the log keeps who and when.
No change requests. The scope is as chartered.