Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1803Survey · Design phasePRJ-18 Tokyo office hybrid meeting roomsTo doSimulated
Vendor site survey and design review
To do · due in 8 dayschecked just now
- 27 OctDue in 8 days
- 8 hEstimate
- 0/4Steps done
What to do
From the Custom room design playbook, Design phase: "Vendor site survey and a review of the design", which produces: Survey notes and questions.
The phase is done when: Design signed off; Lab tests passed.
The spaces
- 15.03 HeronMedium meeting room
- 15.04 CurlewMedium meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.