Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2105Provision · Deploy phasePRJ-21 Heron HDBaseT receiver RMATo doSimulated
Record the replacement's serial and MAC at the receiver's position, and mark the old receiver as returned
To do · due in 7 dayschecked just now
- 26 OctDue in 7 days
- 1 hEstimate
- 0/5Steps done
What to do
From the RMA playbook, Deploy phase: "Add the replacement's serial and MAC at the failed unit's position; mark the old unit as returned".
The phase is done when: Replacement working at its position; Space passes its verification.
The space
- 12.03 HeronLarge meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.