Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2210Install · Deploy phasePRJ-22 Poly VideoOS 4.7.0 rolloutTo doSimulated
Update Heron at the Copenhagen office (wave 2) to 4.7.0
To do · due in 36 dayschecked just now
- 24 NovDue in 36 days
- 1 hEstimate
- 0/5Steps done
What to do
From the Firmware rollout playbook, Deploy phase: "Update each wave, one site at a time".
The phase is done when: Pilot spaces passed; Every wave updated; Every unit reports the target version.
The space
- 4.03 HeronMedium meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.