Out of service
Who was told Simulated from the booking system
Notes from the team
Drawn to scale · 6.40 × 12.00 m, 76.8 m² · 3 seats · Outlets: Type G sockets; UK and Ireland plates, 86 and 146 mm wide; floor boxes with a 300 mm lid · A demo bench at the displays and four demo pods, bar height (house choice)
Compared against
Dual display, video bar: Two 75 in displays with a Poly Studio X72 video bar at the demo bench, the demo machine over HDBaseT, floor boxes with data and power for demo kit, and a booking panel at the door. Lighting scenes come from the building's lighting control; a demo is recorded only in the meeting service, when everyone agrees.
- Required devices
- All recorded
- Wiring
- Checks pass
Lifecycle
- In service
- 7
Meeting platforms
The video bar is certified for Microsoft Teams Rooms and Poly Video Mode (SIP and H.323)
- Poly Studio X72Video barMicrosoft Teams RoomsPoly Video Mode (SIP and H.323)Google Meet: Not confirmed
- Poly TC10Touch controllerGoogle MeetMicrosoft Teams Rooms
- Logitech Tap SchedulerScheduler panelMicrosoft Teams panelGoogle Calendar: Through a partner
Accessibility
A hearing loop, live captions and step-free access
- Hearing loop
- Met IEC 60118-4 at its test on 29 Jul 2026Next loop test due Jul 2027
- Live captions
- On in calls, from the touch panel
- Step-free access
- Yes
- Last walked through
- 9 Jul 2026, by facilities, Dublin office, with the local AV technician
From the office's accessibility record (demo), the same one the room guide reads to people in the room.
Cable tests
Restricted: rack and switch portsAll 13 links passed certification · closest margin 2.6 dB · last tested 26 Jun 2026
| Link | Outlet | Cable | Length | Result | Margin | Tested |
|---|---|---|---|---|---|---|
| DUB-5.21-R1-U31-P01 | Behind the display, 2 | Cat6A | 35.4 m | Pass | 4.29 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P18 | Behind the display, 1 | Cat6A | 35.38 m | Pass | 3.78 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P19 | Behind the display, 3 | Cat6A | 35.46 m | Pass | 2.57 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P20 | Behind the display, 4 | Cat6A | 37.09 m | Pass | 5.73 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P21 | Behind the display, 5 | Cat6A | 37.18 m | Pass | 3.65 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P22 | Behind the display, 6 | Cat6A | 36.87 m | Pass | 5.70 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P23 | Below the table, 1 | Cat6A | 35.08 m | Pass | 5.43 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P24 | Below the table, 2 | Cat6A | 35.1 m | Pass | 5.70 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P25 | Floor box, 1 | Cat6A | 34.77 m | Pass | 3.52 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P26 | Floor box, 2 | Cat6A | 34.85 m | Pass | 2.60 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P27 | Floor box, 3 | Cat6A | 34.98 m | Pass | 5.83 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P28 | Floor box, 4 | Cat6A | 34.84 m | Pass | 6.00 dB | 26 Jun 2026 |
| DUB-5.21-R1-U38-P29 | At the door, 1 | Cat6A | 22.3 m | Pass | 5.16 dB | 26 Jun 2026 |
From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.
Upkeep
Licences from the licence portals
Its pool is short of seats
- Google Meet hardwareEMEA · renews 22 Mar 2027 (in 154 days)5 seats short across the pool
- Poly LensDevice management · renews 21 Jul 2027 (in 275 days)
Room guide and QR
What people in the space seeThe code on the table opens this space's guide: how to start a meeting and share a screen, and a two-tap way to report a problem or ask for something.
Sent from the guide
Nothing sent from this space's guide yet. Reports appear here, on the Incidents board and on Home as they arrive.
Outlets
For this space| Service | Where | How many | Serves | Provided by |
|---|---|---|---|---|
| Power | Behind the display | 6 | display 1, HDBaseT receiver, video bar, display 2, spare, spare | IT |
| Power | Below the table | 2 | HDBaseT transmitter, spare | IT |
| Data | Behind the display | 6 | display 1, video bar, spare, display 2, spare, spare | IT |
| Data | Below the table | 2 | touch controller, spare | IT |
| Direct cable run | Below the table | 2 | HDBaseT link to the display wall, spareCable runs straight from the bench floor box to the display wall. | IT |
| Data | Floor box | 4 | demo kit, demo kit, demo kit, demo kitAt the demo pods, for the demo kit on show | IT |
| Power | Floor box | 8 | demo kit, demo kit, demo kit, demo kit, demo kit, demo kit, demo kit, demo kit | IT |
| Data | At the door | 1 | scheduler panel | IT |
Wiring
6 signal cables, 10 to outletsList every cable
| Cable | From | To |
|---|---|---|
| HDMI | Video bar, hdmi-out-1 | Display 1, hdmi-in-1 |
| HDMI | Video bar, hdmi-out-2 | Display 2, hdmi-in-1 |
| Cat 6 | Display 1, lan-1 | Data outlet 1, behind the display |
| Cat 6 | Video bar, lan-1 | Data outlet 2, behind the display |
| Cat 6 | Display 2, lan-1 | Data outlet 4, behind the display |
| Cat 6 | Touch controller, lan-1 | Data outlet 1, below the table |
| Cat 6A | HDBaseT transmitter, hdbaset-1 | HDBaseT receiver at the display wall, hdbaset-1In direct cable run 1, floor box to display wall. The receiver powers the transmitter over this cable. |
| USB-C | HDBaseT transmitter, usb-c-1 | LaptopThe cable the demo machine plugs into |
| HDMI | HDBaseT receiver at the display wall, hdmi-out-1 | Video bar, hdmi-in-1 |
| USB | HDBaseT receiver at the display wall, usb-b-1 | Video bar, usb-c-1The demo machine's USB through to the video bar, for device mode |
| Cat 6 | Scheduler panel, lan-1 | Data outlet 1, at the door |
| Power | Display 1, power-in | Power outlet 1, behind the display |
| Power | HDBaseT receiver at the display wall, power-in | Power outlet 2, behind the display |
| Power | Video bar, power-in | Power outlet 3, behind the display |
| Power | Display 2, power-in | Power outlet 4, behind the display |
| Power | HDBaseT transmitter, power-in | Power outlet 1, below the tableOptional: the transmitter can also run on power from the receiver |