Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Locations is switched off

Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.

Organisation settings

Shared spaceNYCNew York office · Level 20: welcome and meeting floorIn service

20.01 Reception

All 5 units in service · no open incidentschecked just now

7. Video intercom and remote door release · Set per projectPlate C: Wall plate outside the door, behind the booking panel. 1 data port. Data 1: Door controller for the office entrance (badge readers and the door release)5. Door controller for the office entrance (badge readers and the door release) · outside the door2. Signage player, BrightSign XT1145 · Behind the displayPlate A: Wall plate behind the display. 4 Type B sockets, 3 data ports. Power 1: Display Power 2: signage player Power 3: spare Power 4: spare Data 1: Display Data 2: Signage player Data 3: spare8. Panic button at the desk · Set per projectPlate B: Wall plate on the wall, where the project puts it. 1 Type B socket, 1 data port. Power 1: wall plate (optional) Data 1: wall plate for a laptop (optional)Plate A: Wall plate behind the display. 4 Type B sockets, 3 data ports. Power 1: Display Power 2: signage player Power 3: spare Power 4: spare Data 1: Display Data 2: Signage player Data 3: sparePlate B: Wall plate on the wall, where the project puts it. 1 Type B socket, 1 data port. Power 1: wall plate (optional) Data 1: wall plate for a laptop (optional)1. Display (65 in shown) · Display wall4. CCTV camera · CeilingReception deskReception deskPlate D: Ceiling plate in the ceiling. 2 data ports. Data 1: CCTV camera Data 2: Temperature, humidity and CO2 sensor for the building management system3. Visitor sign-in system · Set per project3. Visitor sign-in system · Set per projectLounge sofaCoffee table6. Temperature, humidity and CO2 sensor for the building management system · CeilingPlantPlantPlantTrack behind the displayCeiling basketCeiling basketCeiling basketCeiling basketPlate A: cabled up inside the wall to the ceiling above the door, back to the comms roomPlate B: cabled up inside the wall to the ceiling above the door, back to the comms roomPlate D: cabled up inside the wall to the ceiling above the door, back to the comms roomHDMI: Signage player HDMI out to Display HDMI in, via the track behind the displayCat 6: Display LAN to plate A, data 1, via the track behind the displayCat 6: Signage player LAN to plate A, data 2, via the track behind the displayPower: Display power to plate A, power 1, via the track behind the displayCat 6: CCTV camera LAN to plate D, data 1, via the ceilingCat 6: Temperature LAN to plate D, data 2, via the ceilingCat 6: Door controller for the office entrance (badge readers and the door release) LAN to plate C, data 1, plugged in beside itWhere the data comes in: above the door, from Comms room (MDF) 20.144. CCTV camera41. Display17. Video intercom and remote door release76. Temperature, humidity and CO2 sensor for the building management system63. Visitor sign-in system3Plate B: Wall plate on the wall, where the project puts it. 1 Type B socket, 1 data port. Power 1: wall plate (optional) Data 1: wall plate for a laptop (optional)B2. Signage player, behind the display25. Door controller for the office entrance (badge readers and the door release), at the door58. Panic button at the desk, set per project8Plate D: Ceiling plate in the ceiling. 2 data ports. Data 1: CCTV camera Data 2: Temperature, humidity and CO2 sensor for the building management systemDPlate C: Wall plate outside the door, behind the booking panel. 1 data port. Data 1: Door controller for the office entrance (badge readers and the door release)CPlate A: Wall plate behind the display. 4 Type B sockets, 3 data ports. Power 1: Display Power 2: signage player Power 3: spare Power 4: spare Data 1: Display Data 2: Signage player Data 3: spareA

Drawn to scale · 6.00 × 5.00 m, 30 m² · 4 seats · Outlets: Type A, B sockets; US plates, 70 mm wide and 46 mm more a gang, 450 mm up to the centre (house default; the space type gives no height) · Space size varies by office; 6 × 5 m shown · Desk for one or two, lounge seating, signage 65 in shown

Incidents

No incidents recorded for this space.

All incidents at New York office

Compared against

Reception

Standard, with the door and building systems wired: The standard reception, with its door controller, CCTV camera and an environment sensor each on a data outlet, so they sit on the Security and Building VLANs.

Required devices
All recorded
Optional fitted
None of 3
Wiring
Checks pass

Lifecycle

In service
5

Cable tests

Restricted: rack and switch ports

All 7 links passed certification · closest margin 3.1 dB · last tested 13 Oct 2026

LinkOutletCableLengthResultMarginTested
NYC-20.14-R1-U06-P01Behind the display, 1Cat6A35.64 mPass3.07 dB6 Oct 2026
NYC-20.14-R1-U06-P02Behind the display, 2Cat6A35.55 mPass3.73 dB6 Oct 2026
NYC-20.14-R1-U06-P03Behind the display, 3Cat6A35.66 mPass5.67 dB6 Oct 2026
NYC-20.14-R1-U06-P04Set per project, 1Cat6A36.81 mPass3.35 dB6 Oct 2026
NYC-20.14-R1-U09-P42Ceiling, 1Cat6A28.14 mPass5.12 dB13 Oct 2026
NYC-20.14-R1-U09-P43At the door, 1Cat6A29.04 mPass4.86 dB13 Oct 2026
NYC-20.14-R1-U09-P44Ceiling, 2Cat6A28.24 mPass5.41 dB13 Oct 2026

From the cabling contractor's certification report, recorded on each run (made up for the demo). A margin under 3 dB passes but is worth a look.

Upkeep

Licences from the licence portals

1 licence, each with a seat for this space

  • BSN.cloudDevice management · renews 7 Mar 2027 (in 139 days)

Outlets

For this space
ServiceWhereHow manyServesProvided by
PowerBehind the display4display, signage player, spare, spareIT
DataBehind the display3display, signage player, spareIT
DataSet per project1wall plate for a laptop (optional)Terminated as a plug so the installer can test itIT
PowerSet per project1wall plate (optional)The wall plate draws 5 V DC at 390 mAIT
DataCeiling2CCTV camera, environment sensorIT
DataAt the door1door controllerIT

Wiring

1 signal cable, 6 to outlets
Video
Where it startsWhere it endsHDMI: Signage player, hdmi-out-1 to Display, hdmi-in-1Signage player, BrightSign XT1145Signage playerBrightSign XT1145hdmi-out-1 · HDMINetwork, behind the display #2Network, behind the display #2Display, Model set per projectDisplayModel set per projecthdmi-in-1Network, behind the display #1Network, behind the display #1Power, behind the display #1Power, behind the display #1CCTV camera, Model set per projectCCTV cameraModel set per projectNetwork, ceiling #1Network, ceiling #1Temperature, humidity and CO2 sensor for the building management system, Model set per projectTemperature, humidityand CO2 sensor for th…Model set per projectNetwork, ceiling #2Network, ceiling #2Door controller for the office entrance (badge readers and the door release), Model set per projectDoor controller forthe office entrance…Model set per projectNetwork, at the door #1Network, at the door #1
List every cable
CableFromTo
HDMISignage player, hdmi-out-1Display, hdmi-in-1
Cat 6Display, lan-1Data outlet 1, behind the display
Cat 6Signage player, lan-1Data outlet 2, behind the displayPoE+ powers the player
PowerDisplay, power-inPower outlet 1, behind the display
Cat 6CCTV camera, lan-1Data outlet 1, ceilingPoE powers the camera
Cat 6Temperature, humidity and CO2 sensor for the building management system, lan-1Data outlet 2, ceilingPoE powers the sensor
Cat 6Door controller for the office entrance (badge readers and the door release), lan-1Data outlet 1, at the doorPoE powers the controller and its readers

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 20.01 Reception, New York office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.