Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1211Provision · Deploy phasePRJ-12 New York office video bar refreshTo doSimulated
Provision the Skylark replacement before it is unboxed
To do · due in 11 dayschecked just now
- 30 OctDue in 11 days
- 2 hEstimate
- 0/5Steps done
What to do
The phase is done when: Every space in the batch installed; Every space passes, or its snags are accepted.
The space
- 21.05 SkylarkHybrid meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.