Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1401Survey · Plan phasePRJ-14 Juneau office fit-outDoneSimulated
Survey the floor and confirm space types
Done · 4 steps completechecked just now
- 27 MarWas due 27 Mar
- 16 hEstimate
- 4/4Steps done
What to do
From the New office build playbook, Plan phase: "Floor survey with facilities and the landlord", which produces: Floor survey.
The phase is done when: Budget and dates approved; Circuit ordered; Every space has a space type.
The spaces
- 2.02 HeronSmall meeting room
- 2.03 WrenHuddle room, small
- 2.04 Focus 2.04Focus room
- 2.05 Focus 2.05Focus room
- 2.06 Copy and printPrint room
- 2.07 Flex desks AHot desk
Assign to