Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-2204Design · Plan phasePRJ-22 Poly VideoOS 4.7.0 rolloutTo doSimulated
Choose the pilot rooms and the waves by office, and avoid the year-end freeze
To do · due in 16 dayschecked just now
- 4 NovDue in 16 days
- 2 hEstimate
- 0/5Steps done
What to do
From the Firmware rollout playbook, Plan phase: "Pick the waves by office and avoid busy weeks and change freezes", which produces: Wave plan.
The phase is done when: Lab test passed; Version approved as the standard; Pilot spaces and waves agreed.
The spaces
- 3.03 HeronLarge meeting room
- 3.05 GannetMedium meeting room
- 3.06 KestrelMedium meeting room
- 4.03 HeronMedium meeting room
- 4.04 CurlewMedium meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.