Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Vendors is switched off
The companies that install and repair, and who looks after each. This demo has the Vendors module switched off in Organisation settings.
RegisterSimulated
Vendor access register
8 open grants, each tied to a job · no standing accesschecked just now
- 8Open now
- 3Ended with their job
- 0Standing grants
- 3Vendors
| Grant | Vendor and person | Opens | From | Until |
|---|---|---|---|---|
| OpenINC0041215 Room down: codec will not start | Keystone ServiceDev Patel, partner staff | 20.05 Curlew, New Yorkthis space, this unit, its build sheet, the job's timeline | 19 Oct 2026, 09:40 | When the job closes |
| OpenINC0041214 Video bar fan noise, swap under warranty | Keystone ServiceDev Patel, partner staff | 3.09 Whooper Swan, Dublinthis space, this unit, its build sheet, the job's timeline | 19 Oct 2026, 08:05 | When the job closes |
| OpenINC0041199 Camera not detected | Keystone ServiceDev Patel, partner staff | 4.11 Goldcrest, Copenhagenthis space, this unit, its build sheet, the job's timeline | 16 Oct 2026, 08:00 | When the job closes |
| OpenDSGN-15-01 Design review: the divisible town hall | Brightwave IntegrationLena Fischer, partner staff | 3.04 Curlew, Dublinthe space design, the job's timeline | 15 Oct 2026, 14:00 | When the job closes |
| OpenSURV-0415 Site survey before the 3.09 refit | Brightwave IntegrationLena Fischer, partner staff | 3.09 Whooper Swan, Dublinthis space, the space design, the job's timeline | 14 Oct 2026, 09:00 | When the job closes |
| EndedINC0041171 Touch panel cracked | Keystone ServiceDev Patel, partner staff | 4.05 Goldcrest, Dublinthis space, this unit, its build sheet, the job's timeline | 12 Oct 2026, 11:00 | 13 Oct 2026, 09:30 |
| OpenTASK-14-2-03 Record serials and MACs, 2.03 | Northlight AVSam Okafor, partner staff | 2.03 Wren, Juneauthis space, its build sheet, the model and its setup guide, the job's timeline | 12 Oct 2026, 09:00 | When the job closes |
| OpenSURV-0412 Site survey before the 12.09 refit | Northlight AVSam Okafor, partner staff | 12.09 Whooper Swan, Chicagothis space, the space design, the job's timeline | 9 Oct 2026, 10:00 | When the job closes |
| OpenSNAG-14-02 Camera framing too tight for the far seats | Northlight AVSam Okafor, partner staff | 2.02 Heron, Juneauthis space, this unit, its build sheet, the job's timeline | 7 Oct 2026, 15:00 | When the job closes |
| EndedDSGN-15-00 Concept design: the divisible town hall | Brightwave IntegrationLena Fischer, partner staff | 3.04 Curlew, Dublinthe space design, the job's timeline | 1 Oct 2026, 09:00 | 5 Oct 2026, 16:00 |
| EndedSNAG-14-05 Cable cover missing under the table | Northlight AVSam Okafor, partner staff | 2.05 Focus 2.05, Juneauthis space, this unit, its build sheet, the job's timeline | 29 Sep 2026, 10:00 | 2 Oct 2026, 15:20 |
No grants match these filters.
Sign-in is through each partner's own company account, with two-step sign-in. Everything opened under a grant is logged with who, what and when, and the whole register can be exported or a grant ended early by the vendor's owner at Aigna. Never shared with a partner: floor plans, other spaces, IP addresses and switch ports.