Keia Method· Level 3 · How it fits · 4.7

ISO 41001 and ISO 55001

Requirements for a facility management system (ISO 41001) and an asset management system (ISO 55001).

How Keia relates
Companion to ISO 55001: for technology assets; ISO 41001 is out of scope
Which version
ISO 41001:2018, with Amendment 1:2024 (climate action changes); ISO lists a revision under way. ISO 55001:2024, with its vocabulary in ISO 55000:2024. Both are management system standards: they ask for a whole system, of which a record is one part.

How the ideas map

Brief: these touch Keia at the edges.

Keia ideaISO 41001 and ISO 55001What Keia adds
Start from the buildingISO 55001: knowing what assets you hold and where. ISO 41001: the facility the technology lives inEvery unit sits in a space on a floor plan. Space data is exchanged with facilities systems, never owned by Keia
Capture, don't askISO 55001: asset information kept currentPurchase date, expected life, power draw and disposal route per device, updated by the work
Answer firstISO 55001: performance of assets over their lifeThe work plan shows the devices due for refresh under the policy, and whether each is in a project
Own it, hand it onISO 41001: the facility services around the technologyVendors and partners work as peers, with contracts, end dates and access scoped to the job

Use your normal process here

  • Leases, space planning, moves and soft services such as cleaning and catering: ISO 41001's ground, and another profession's record
  • Heating, ventilation and building control
  • Asset management policy and strategy, and the financial value of assets
  • Laptops and phones: outside Keia's scope

Words side by side

Keia saysThey say
Unit (one physical thing)Asset
Keia Atlas (the record)One part of an asset management system, never the whole of one

Sources

Try it in the demo

Opens as Claire, head of the service. Everyone in the demo is made up; nothing you do leaves this browser.

  1. Open the Work plan: the devices due for refresh under the policy.
  2. Each line says whether the device is already in a project.
Open the Work plan

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About ISO 41001 and ISO 55001 (the Keia Method)

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.