Keia Method· Level 3 · How it fits · 4.6

AVIXA standards

The AV industry association's standards for designing, documenting and verifying audiovisual systems.

How Keia relates
Companion: the record holds the evidence; the standards say what good is
Which version
AVIXA's published standards as listed on 30 September 2026. The performance verification standard is now ANSI/AVIXA D402.02:2013 (R2024), reaffirmed in 2024; it was formerly ANSI/INFOCOMM 10:2013. AVIXA publishes no project management standard; the nearest is its documentation standard.

How the ideas map

Each Keia idea, the AVIXA standard it serves, and what Keia adds.

Keia ideaAVIXA standardsWhat Keia adds
Start from the buildingANSI/AVIXA V202.01:2026 Display Image Size for 2D Content (DISCAS); ANSI/AVIXA A102.01:2022 Audio Coverage Uniformity; AVIXA S601.01:2021 Energy Management for Audiovisual SystemsEach space type records the basis for its display size, and the house meeting room standard designs loudspeakers to AVIXA's coverage method, so every space built to them starts from the same rule. The house display standard switches displays on the room system and a timer
Capture, don't askAVIXA F501.01:2015 Cable Labeling for AV SystemsEach cable is a record with its label and both ends, under the house cable colour and labelling standard
Answer firstANSI/AVIXA D402.02:2013 (R2024) AV Systems Performance VerificationDeploy ends with a short room test per space, and its result stays on the space's record. It is a check, not a verification to the standard; where you verify to D402.02, the record holds the report
Own it, hand it onANSI/AVIXA D401.01:2023 Documentation Requirements for Audiovisual SystemsThe integrator hands over by leaving the as-built record, and the team runs from that record the next day
Learn as you goAVIXA's credentials: CTS, CTS-D, CTS-IKeia certifies nobody. The setup guide beside the device and the room guide help a technician learn on the job, alongside a credential

Use your normal process here

  • AV system design and its review: drawings, calculations, the design process
  • Performance verification itself: its tests, methods and pass criteria (Keia records the result)
  • Rack design and rack building
  • Lighting, contrast and acoustic measurement
  • Professional credentials and training

Words side by side

Keia saysAVIXA says
Room testPerformance verification (a far fuller set of checks, to the standard)
As-built recordAs-built documentation
Space typeNo single term; the design basis for a kind of room

Sources

Official source. AVIXA: published standards

Checked 30 September 2026.

Every framework, and how Keia relates to each

Try it in the demo

  1. Open the Displays standard: how every display is sized, mounted and wired, and how each is checked.
  2. Look for the sources: each rule names the outside standard it rests on.
Open the Displays standard

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About AVIXA standards (the Keia Method)

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.