Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1905Network · Procure phasePRJ-19 Melbourne office IDF switch refreshTo doSimulated
Pre-stage the switch configuration
To do · due in 18 dayschecked just now
- 6 NovDue in 18 days
- 8 hEstimate
- 0/4Steps done
What to do
From the Comms room refresh playbook, Procure phase: "Pre-stage the configuration in the Lab".
The phase is done when: Everything received and pre-staged.
The spaces
- 8.01 ReceptionReception
- 8.03 HeronLarge meeting room
- 8.06 KestrelSmall meeting room
Assign to
How it closed
Closing a task needs one of these. It takes under 30 seconds.