Healthy when
- recorded in the space its space type expects
- every port wired as the space type says
- status is active
- space matches where the device is installed
- address reservation matches the MAC address
Vendor access
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Task T-1907Commission · Deploy phasePRJ-19 Melbourne office IDF switch refreshTo doSimulated
To do · due in 56 dayschecked just now
From the Comms room refresh playbook, Deploy phase: "Re-verify every AV room on the list".
The phase is done when: Every port moved and up; Every device back and monitored.
Assign to
Closing a task needs one of these. It takes under 30 seconds.
Type the way you would ask a colleague. Keia Atlas picks out what you want, where, which model and which status, and shows each as a chip you can remove or change.