Task T-2101Survey · Plan phasePRJ-21 Heron HDBaseT receiver RMADoneSimulated
Prove the fault: swap the cable, then try a bench receiver
Done · 4 steps completechecked just now
- 15 OctWas due 15 Oct
- 2 hEstimate
- 4/4Steps done
What to do
From the RMA playbook, Plan phase: "Prove the fault: swap one part at a time until it follows the unit", which produces: Fault notes.
The phase is done when: Fault proved; RMA number recorded; Workaround in place.
The space
- 12.03 HeronLarge meeting room
Assign to
How it closed
"A bench receiver is the fastest test on a passive HDBaseT run: it separated the receiver from the cable in one try."
Grace Kim · now in the guide for the next install