Task T-2103Install · Plan phasePRJ-21 Heron HDBaseT receiver RMADoneSimulated
Run a long HDMI cable from the table to the scaler as a workaround
Done · 5 steps completechecked just now
- 15 OctWas due 15 Oct
- 1 hEstimate
- 5/5Steps done
What to do
From the RMA playbook, Plan phase: "Look in the office's IT store for a spare of the same model. If there is one, the swap can happen now; if not, give the space a workaround until the replacement arrives".
The phase is done when: Fault proved; RMA number recorded; Workaround in place.
The space
- 12.03 HeronLarge meeting room
Assign to