Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Projects is switched off
Projects, the schedule, planning, the work plan and the Lab. This demo has the Projects module switched off in Organisation settings.
Project PRJ-14Juneau officeDeploy phaseSimulated live
Deploy
7 of 18 units set up · 2 waiting on youchecked just now
Viewing as . Only your installs show: select Installed when a unit is mounted, connected and powered on, and Keia Atlas confirms it when it comes online.
Nothing on this project is for you to install. Your own projects are on the vendor page.
Ready for you
Only the exceptions. Everything else, Keia Atlas checks.Automatic updates: On. Fleet Lens turned them back on (advisory ADV-001).
Reapply the setup guide to this unit.
Room test failed: test call from another site
"Camera framing too tight for the far seats". Fix it, then test again.
Waiting on: Certificate request with IT security
T-1406 Printer on the network and in the print queue. Anna is on it; nothing to do here until it clears.
Checked by Keia Atlas
Passed, waiting for a person to accept12 steps passed on 10 of 15 units in Second floor, south side
in the asset register, DNS and device management, online on the right switch ports. 19 checks passed; 1 exception left out.
Deliver by
The team's way · Northlight AV fits out by zone: each side of the floor is installed, set up and commissioned before the next.
2 of 3 units checked; waiting on certificate request with IT security
2.04 Focus 2.04Signed off
2.05 Focus 2.05Signed off
2.06 Copy and printRoom test once its unit is set up
- PrinterCanon imageRUNNER ADVANCE DX C259 · jnu-206-prn01Waiting on: certificate request with IT security
5 of 15 units checked; 2.02 Heron video bar's automatic updates differ from the setup guide, and 1 more for you
2.02 HeronRoom test: 1 failure
- Video barPoly Studio X52 · jnu-202-vc01Ready for you: drifted
- Displayjnu-202-dsp01Accepted
- Touch controllerPoly TC10 · jnu-202-tc01Accepted
- HDBaseT transmitterKramer EXT3-C-XR-TAccepted
- AV extenderKramer EXT3-POE-XR-RAccepted
2.03 WrenRoom test once all 2 are set up
- Displayjnu-203-dsp012 steps to accept
- Video barLogitech MeetUp 2 · jnu-203-vc012 steps to accept
2.07 Flex desks ARoom test once all 8 are set up
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
- MonitorDell UltraSharp 27 Thunderbolt Hub Monitor1 step to accept
Nothing matches these filters.
Deploy tasks
11 on this projectHow Deploy works
The team's way
Batches by default: units that share a setup guide are set up together, the shared setup once, then only what differs per unit. By room, by floor or one at a time where the team works that way, or a set you pick. Every way shows the same units and checks, so switching loses nothing.
Checked, not ticked
Keia Atlas checks what it can see: the records in the systems, the unit online on its switch port, the settings read back. What passes waits for one Accept, recorded with who, when and what passed. Exceptions stay out of it until someone fixes them.
Spaces and installers
Commissioning is space by space: a short room test once every unit is set up, and "All passed" signs the space off. A vendor sees only their installs, one action per unit. Every change is live between windows, with History and Undo.