Comms roomCHIChicago office · Level 13In serviceOlder kit, refresh 2027

13.20 Comms room (IDF)

Older kit, refresh 2027 · no open incidentschecked just now

Restricted: rack and switch ports

  • Patching
  • Switching
  • Management
  • Power
  • Free space

42U · 23U used, 19U free

  1. U42: Fibre patch, Corning Closet Connector Housing, 1U
  2. U41: Out-of-band console server, ZPE Nodegrid Serial Console Plus, 48 ports
  3. U38 to U39: Patch panel A, Level 13, Panduit NetKey Cat6A patch panel, 48 ports
  4. U37: Access switch 1, Cisco Catalyst 9300-48P, In service, no open incidents
  5. U34 to U35: Patch panel B, Level 13, Panduit NetKey Cat6A patch panel, 48 ports
  6. U33: Access switch 2, Cisco Catalyst 9300-48P, In service, no open incidents
  7. U30 to U31: Patch panel C, Level 13, Panduit NetKey Cat6A patch panel, 48 ports
  8. U29: Access switch 3, Cisco Catalyst 9300-48P
  9. U26 to U27: Patch panel D, Level 13, Panduit NetKey Cat6A patch panel, 48 ports
  10. U25: Access switch 4, Cisco Catalyst 9300-48P
  11. U23: Patch panel, AV outlets
  12. U22: AV switch on a shelf, Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD), In service, no open incidents
  13. U19 to U21: Space for a large room's codec
  14. U3 to U18: Space for growth
  15. U1 to U2: UPS, APC Smart-UPS SRT 3000VA, 2U

Rack space

19U free of 42U

23U used. 3U kept for a large room's codec.

Needs 42U for what it serves: exactly enough.

Access ports

10 free of 192

  • Access switch 146 of 48
  • Access switch 246 of 48
  • Access switch 345 of 48
  • Access switch 445 of 48
  • Outlets patched181 of 192
  • AV switch9 of 10

Needs 218 (181 + 20% headroom): short by 26.

PoE 437W to 1440W of PoE+ power depending on power-supply configuration on each of 4, as the vendor states. The draw is not measured.

Power

APC Smart-UPS SRT 3000VA, 2U

  • FeedsA and B
  • Load and runtime35%, 29 min

2 power strips at the back: Raritan PX3 monitored rack PDU.

Circuits: A from DB-13A, way 12; B from DB-13B, way 14.

Uplink

Out-of-band: out-of-band console server (ZPE Nodegrid Serial Console Plus, 48 ports).

Power and temperature

Against the power and racks standards

UPS runs 29 min at 35% load, inside the standard · the room is at 22.4 °C

UPS runtime · APC Smart-UPS SRT 3000VA, 2U

29 min at least 15

UPS load

35% at most 80%

Temperature Simulated

22.4 °C 18 to 27

Runtime and load as measured at the last timed test, 21 Oct 2025 Demo value. Temperature from the temperature probe on the UPS network card, at the front of the rack, reporting to monitoring; live readings come by connector.

If this were off

Simulated

Pick a switch, gateway or circuit here to see which spaces, meetings and services would lose the internet. Worked out from the recorded patching.

Take off

Access switch 1 Cisco Catalyst 9300-48P · Rack 1, U37 · 13.20 Comms room (IDF)

Would affect 12 spaces, 42 meetings in the next 24 hours (149 people) and 2 services

  • Level 12

  • Level 13

Would be affected: a projection, not a fault Keeps workingRestricted: floor plan
Its portsPressed ports are off; press one to keep it on and narrow the picture
4748UpUp

Restricted: rack and switch ports "Up" is an uplink: the way this switch reaches the internet.

Spaces it would cut off 12

VLANs at the Chicago office

9 VLANs · 0 ports to review

Every port on its planned VLAN

Switches here chi-1320-as01Access switch 1chi-1320-as02Access switch 2chi-1320-as03Access switch 3chi-1320-as04Access switch 4

In-room switches chi-1208-sw0112.08 Barn Owl

VLANPrefixGatewayAddressesReachesPorts
10 Management10.40.10.0/2410.40.10.122 reservationsreserved 10.40.10.20 to 10.40.10.219 · pool 10.40.10.220 to 10.40.10.254Only the network team's tools and the controller48
20 Corporate10.40.20.0/2210.40.20.1None reservedreserved 10.40.20.20 to 10.40.20.219 · pool 10.40.21.1 to 10.40.23.254Internal services and the internet51
30 Room systems10.40.30.0/2410.40.30.131 reservationsreserved 10.40.30.20 to 10.40.30.219 · pool 10.40.30.220 to 10.40.30.254Their cloud services, device management and the booking service32
31 Displays and signage10.40.31.0/2410.40.31.128 reservationsreserved 10.40.31.20 to 10.40.31.219 · pool 10.40.31.220 to 10.40.31.254The display and signage management platforms, NTP and the room control system28
40 AV169.254.0.0/16None: not routedLink-local, in each roomNothing outside the room (not routed)1
50 Building10.40.50.0/2410.40.50.1None reservedreserved 10.40.50.20 to 10.40.50.219 · pool 10.40.50.220 to 10.40.50.254The building management platform only0
60 Security10.40.60.0/2410.40.60.1None reservedreserved 10.40.60.20 to 10.40.60.219 · pool 10.40.60.220 to 10.40.60.254The security platforms only0
70 Printers10.40.70.0/2410.40.70.11 reservationreserved 10.40.70.20 to 10.40.70.219 · pool 10.40.70.220 to 10.40.70.254The print service1
90 Guest10.40.90.0/2310.40.90.1None reservedpool 10.40.90.20 to 10.40.91.254The internet only, clients cannot see each other0

From the network standard's VLAN plan. Prefixes, gateways and addresses are made up for the demo; the ports are as recorded for the demo, as the switch platforms would report them.

Incidents

No incidents recorded for this space.

All incidents at Chicago office

Compared against

Floor comms room (IDF)

Cisco (older): The earlier build: the floor's patch panels and Cisco access switches, a fibre link back to the MDF, an out-of-band console server, and room for a large room's codec, on a UPS. Rooms built to it move to UniFi when their switches are refreshed.

Network standard
Older kit, due 2027
Required devices
All recorded
Optional fitted
None of 1

Older kit: Cisco Catalyst 9300-48P. Moves to UniFi when refreshed.

Lifecycle

In service
3

Upkeep

Room checks from the maintenance planner

Next check: Thu, 29 Oct

Sized for what it serves

20 spaces, 58 desks, 9 video rooms · How a comms room is sized
  1. Data outlets18120 spaces, 58 desks, 9 video rooms192panel ports11 to spare
  2. Access ports218181 + 20% headroom192on 4 switchesShort by 26
  3. Access switches548 ports each4Short by 1
  4. PoE budget377 W16 devices as the vendors state; 9 PoE devices with no figureNot recordedNot recorded
  5. Rack space42U24U of parts + 25% growth42UExactly enough
  6. UPSNot sizedload and runtime not recordedAPC Smart-UPS SRT 3000VA, 2Uin the rackNot checked

Patching

219 cables in 15 runs, coloured by the house cable standard · All cables at Chicago office

Restricted: rack and switch ports

Spaces it serves

20 spaces

Notes

  • The rack also holds access switches 3 and 4, added as the floor filled. The comms room (IDF) type gives two access switch positions, so they are counted from the rack.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 13.20 Comms room (IDF), Chicago office

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.