Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Locations is switched off

Regions, offices, floors and the spaces in them. This demo has the Locations module switched off in Organisation settings.

Organisation settings

Comms roomDUBDublin office · Fourth floorBeing replacedUniFi, old units to collect

4.21 Comms room (IDF)

UniFi, old units to collect · no open incidentschecked just now

Restricted: rack and switch ports

  • Patching
  • Switching
  • Management
  • Power
  • Free space

42U · 27U used, 15U free

  1. U42: Fibre patch, Corning Closet Connector Housing, 1U
  2. U41: Out-of-band console server, ZPE Nodegrid Serial Console Plus, 48 ports
  3. U38 to U39: Patch panel A, fourth floor, Panduit NetKey Cat6A patch panel, 48 ports
  4. U37: Access switch 1, Ubiquiti UniFi Switch Pro Max 48 PoE, In service, no open incidents
  5. U34 to U35: Patch panel B, fourth floor, Panduit NetKey Cat6A patch panel, 48 ports
  6. U33: Access switch 2, Ubiquiti UniFi Switch Pro Max 48 PoE, In service, no open incidents
  7. U30 to U31: Patch panel C, fourth floor, Panduit NetKey Cat6A patch panel, 48 ports
  8. U29: Access switch 3, Ubiquiti UniFi Switch Pro Max 48 PoE, In service, no open incidents
  9. U26 to U27: Patch panel D, fourth floor, Panduit NetKey Cat6A patch panel, 48 ports
  10. U25: Access switch 4, Ubiquiti UniFi Switch Pro Max 48 PoE, In service, no open incidents
  11. U22 to U23: Patch panel E, fourth floor, Panduit NetKey Cat6A patch panel, 48 ports
  12. U21: Access switch 5, Ubiquiti UniFi Switch Pro Max 48 PoE, In service, no open incidents
  13. U19: Patch panel, AV outlets
  14. U18: AV switch on a shelf, Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD), In service, no open incidents
  15. U15 to U17: Space for a large room's codec
  16. U3 to U14: Space for growth
  17. U1 to U2: UPS, APC Smart-UPS SRT 3000VA, 2U

Rack space

15U free of 42U

27U used. 3U kept for a large room's codec.

Needs 42U for what it serves: exactly enough.

Access ports

40 free of 240

  • Access switch 140 of 48
  • Access switch 241 of 48
  • Access switch 340 of 48
  • Access switch 440 of 48
  • Access switch 539 of 48
  • Outlets patched199 of 240
  • AV switch9 of 10

Needs 239 (199 + 20% headroom): 1 to spare.

PoE 720W total PoE availability on each of 5, as the vendor states. The draw is not measured.

Power

APC Smart-UPS SRT 3000VA, 2U

  • FeedsA and B
  • Load and runtime38%, 26 min

2 power strips at the back: Raritan PX3 monitored rack PDU.

Circuits: A from DB-4A, way 12; B from DB-4B, way 14.

Uplink

Out-of-band: out-of-band console server (ZPE Nodegrid Serial Console Plus, 48 ports).

Power and temperature

Against the power and racks standards

UPS runs 26 min at 38% load, inside the standard · the room is at 20.8 °C

UPS runtime · APC Smart-UPS SRT 3000VA, 2U

26 min at least 15

UPS load

38% at most 80%

Temperature Simulated

20.8 °C 18 to 27

Runtime and load as measured at the last timed test, 2 Apr 2026 Demo value. Temperature from the temperature probe on the UPS network card, at the front of the rack, reporting to monitoring; live readings come by connector.

If this were off

Simulated

Pick a switch, gateway or circuit here to see which spaces, meetings and services would lose the internet. Worked out from the recorded patching.

Take off

Access switch 1 Ubiquiti UniFi Switch Pro Max 48 PoE · Rack 1, U37 · 4.21 Comms room (IDF)

Would affect 10 spaces, 32 meetings in the next 24 hours (117 people) and 2 services

  • Third floor

  • Fourth floor

  • Fifth floor

Would be affected: a projection, not a fault Keeps workingRestricted: floor plan
Its portsPressed ports are off; press one to keep it on and narrow the picture
4142434445464748UpUp

Restricted: rack and switch ports "Up" is an uplink: the way this switch reaches the internet.

Spaces it would cut off 10

VLANs at the Dublin office

9 VLANs · 2 ports to review
  • To reviewdub-321-as02 port 24 · Display 2 · dub-309-dsp02, 3.09 Whooper SwanPlanned VLAN 31 Displays and signage, seen VLAN 20 Corporate on the switch.
  • To reviewdub-421-as01 port 22 · Scheduler panel · dub-404-sch01, 4.04 RobinPlanned VLAN 30 Room systems, seen VLAN 1 (the switch default) on the switch.

Switches here dub-421-as01Access switch 1dub-421-as02Access switch 2dub-421-as03Access switch 3dub-421-as04Access switch 4dub-421-as05Access switch 5

In-room switches dub-303-sw013.03 Herondub-309-sw013.09 Whooper Swandub-502-sw015.02 Boardroomdub-504-sw015.04 Briefing auditorium

VLANPrefixGatewayAddressesReachesPorts
10 Management10.20.10.0/2410.20.10.136 reservationsreserved 10.20.10.20 to 10.20.10.219 · pool 10.20.10.220 to 10.20.10.254Only the network team's tools and the controller75
20 Corporate10.20.20.0/2210.20.20.1None reservedreserved 10.20.20.20 to 10.20.20.219 · pool 10.20.21.1 to 10.20.23.254Internal services and the internet58
30 Room systems10.20.30.0/2410.20.30.146 reservationsreserved 10.20.30.20 to 10.20.30.219 · pool 10.20.30.220 to 10.20.30.254Their cloud services, device management and the booking service52
31 Displays and signage10.20.31.0/2410.20.31.137 reservationsreserved 10.20.31.20 to 10.20.31.219 · pool 10.20.31.220 to 10.20.31.254The display and signage management platforms, NTP and the room control system37
40 AV169.254.0.0/16None: not routedLink-local, in each roomNothing outside the room (not routed)11
50 Building10.20.50.0/2410.20.50.11 reservationreserved 10.20.50.20 to 10.20.50.219 · pool 10.20.50.220 to 10.20.50.254The building management platform only1
60 Security10.20.60.0/2410.20.60.12 reservationsreserved 10.20.60.20 to 10.20.60.219 · pool 10.20.60.220 to 10.20.60.254The security platforms only2
70 Printers10.20.70.0/2410.20.70.12 reservationsreserved 10.20.70.20 to 10.20.70.219 · pool 10.20.70.220 to 10.20.70.254The print service2
90 Guest10.20.90.0/2310.20.90.1None reservedpool 10.20.90.20 to 10.20.91.254The internet only, clients cannot see each other0

From the network standard's VLAN plan. Prefixes, gateways and addresses are made up for the demo; the ports are as recorded for the demo, as the switch platforms would report them.

Incidents

No incidents recorded for this space.

All incidents at Dublin office

Compared against

Floor comms room (IDF)

UniFi: The floor's patch panels and UniFi Pro Max 48 PoE access switches (as many as the floor's outlets need) with 10G fibre back to the MDF, the Netgear AV switch for Dante and Q-SYS, an out-of-band console server, and room for a large room's codec, on a UPS.

Network standard
UniFi
Required devices
All recorded
Optional fitted
None of 1

Lifecycle

In service
6
Retired
2

Upkeep

Room checks from the maintenance planner

Next check: Thu, 29 Oct

Sized for what it serves

21 spaces, 68 desks, 8 video rooms · How a comms room is sized
  1. Data outlets19921 spaces, 68 desks, 8 video rooms240panel ports41 to spare
  2. Access ports239199 + 20% headroom240on 5 switches1 to spare
  3. Access switches548 ports each5Exactly enough
  4. PoE budget497 W18 devices as the vendors state; 6 PoE devices with no figure3600 Was the vendor states3103 W to spare
  5. Rack space42U27U of parts + 25% growth42UExactly enough
  6. UPSNot sizedload and runtime not recordedAPC Smart-UPS SRT 3000VA, 2Uin the rackNot checked

Patching

235 cables in 15 runs, coloured by the house cable standard · All cables at Dublin office

Restricted: rack and switch ports

Spaces it serves

21 spaces

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About 4.21 Comms room (IDF), Dublin office