Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Services is switched off
The services the team runs, their health and their standard. This demo has the Services module switched off in Organisation settings.
Services capability
Events and experience centres is switched off
Client briefings: readiness, demo kit, a technician on site, a report. This demo has Events and experience centres switched off in Organisation settings, so nothing of it shows anywhere.
Event EVT-02 · Customer visitFine · ranSimulated
Quillfield Health customer visit
Ran: 4 of 4 items, no faults
Readiness at the start
6 of 6 doneRooms tested
- 5.01 Welcome lounge tested12 Oct, 16:10
- 5.02 Boardroom tested12 Oct, 16:15
Demo kit
- Demo kit unit 2 chargedChecked out 09:00
- Demo kit unit 2 testedChecked out 09:00
The show
- Content loaded12 Oct, 16:30
- Backup plan written3.03 Heron on the third floor is held as a fallback room for the morning.
The checks are generated from the event: a test of every room on the day or the afternoon before, each demo kit unit charged to 80% and tested within 14 days, the content, the recording when it is recorded, and a backup plan.
Run of show
As it was planned- 10:00 to 10:20Welcome5.01 Welcome loungeNow
- 10:20 to 11:30Joint roadmap5.02 Boardroom · Account directorNow
- 11:30 to 12:15A walk through the office5.01 Welcome loungeNow
- 12:15 to 13:00Lunch5.01 Welcome loungeNow
Rooms
2 rooms on the Dublin briefing centre- Briefing centreAll fine
Key
- FineWorking as it should
- To reviewSomeone should look, nothing is down
- FaultNot working, or past its target
- Not reportingNo word from its feed within the window
Tested for this event
- 5.01 Welcome loungeTested 12 Oct, 16:10 · 3 items
- 5.02 BoardroomTested 12 Oct, 16:15 · 1 item
Demo kit
Booked to this event, checked out and back in| Unit | Charge | Last tested | Checked out | Checked in |
|---|---|---|---|---|
| Unit 2: Wireless microphone set | 96% | 15 Oct | 09:00 | 13:20 |
The report
Taken from the record, never asked forWhat ran
4 of 4 items
6 of 6 checks done at the startTime lost
0 min
No faultsLessons
0
Captured from the faults and the checksIt ran as planned: nothing to learn this time.