Keia Atlas

Vendor access

This part is for Aigna staff

Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.

Go to your installation

Module

Services is switched off

The services the team runs, their health and their standard. This demo has the Services module switched off in Organisation settings.

Organisation settings

Services capability

Events and experience centres is switched off

Client briefings: readiness, demo kit, a technician on site, a report. This demo has Events and experience centres switched off in Organisation settings, so nothing of it shows anywhere.

Organisation settings

ServiceOwner: Sofia ReyesFine · within targetSimulated

Events and experience centres

Today's briefing is at risk: demo kit unit 3 not charged

Coming up

3 events · readiness as of 09:20 today

The briefing centre

Dublin office, fifth floor
Key
  • FineWorking as it should
  • To reviewSomeone should look, nothing is down
  • FaultNot working, or past its target
  • Not reportingNo word from its feed within the window

Its rooms

Demo and loaner kit

Kept in 5.05 Control room · booked to events, checked out and in
UnitNowChargeLast testedNext booking
Unit 1: Portable video bar on a stand · Demo · Poly Studio X32In progress · checked out 08:20No battery4 days agoEVT-03, today
Unit 2: Wireless microphone set · DemoIn progress · checked out 08:2096%4 days agoEVT-03, today
Unit 3: Display cart with battery · Demo · Samsung QM65CPlanned · booked to EVT-0338%, to charge3 days agoEVT-03, today
Unit 4: Whiteboard camera · Demo · Logitech ScribePlanned · booked to EVT-04No battery13 days agoEVT-04, Thu, 22 Oct
Unit 5: Portable loudspeaker · LoanerPlanned · booked to EVT-04100%18 days agoEVT-04, Thu, 22 Oct
Unit 6: Wireless presentation receiver · LoanerPlanned · booked to EVT-05No battery4 days agoEVT-05, Thu, 29 Oct

A unit is ready at 80% charge and tested within 14 days of its event; checking it out to an event counts as its checks. The same unit cannot be booked to two events on one day. Charge and test dates are simulated.

History

2 events · each report taken from the record

Service map

Each part lit by the worst state of its kit
  1. AVThe room kit · its own service
  2. Rooms and their kit59 of 59 working
  3. Demo kit6 units, 2 to see to
  4. Readiness checks0 of 3 events ready
  5. Client briefingsReady, staffed and reported
Connectors
  • Room booking · simulated
  • Poly Lens · simulated
  • The events calendar · simulated

Targets

3 of 3 kept · from the events' records and the units
TargetPromiseThis monthKept
Events ready by their startAt least 100%100%Fine · kept
Experience centre kit workingAt least 99%100%Fine · kept
Time lost per eventUnder 10 min6 minFine · kept

The standard

A house choice

Experience centresHouse choice

Every event is checked before it starts, staffed while it runs and reported after it ends.

  • Test every room an event uses on the day, or the afternoon before.A room that worked last week is not a room that works now.
  • Charge demo kit to at least 80 percent and test it within 14 days of the event.Flat or untested kit is the most common way a demo goes wrong.
  • Load the content, and test the recording when the event is recorded, before the day starts.Nothing is copied or set up in front of the client.
  • Write a backup plan for every event: another room, or another way to show the demo.When something fails, the plan is already made.
  • Keep a technician on site for the whole event; an incident in an event room during an event is P1.A live client briefing cannot wait in a queue.

Each room's own kit follows its space type: the executive boardroom, demo zone, briefing auditorium, welcome lounge and control room each have one, with display, audio, camera, lighting and recording where the room needs them.

Every unit in the briefing centre

59 of 59 working
UnitSpaceState
Welcome screen · Samsung QM85C5.01 Welcome loungeFine
Lounge screen for a host's laptop · Samsung QM65C5.01 Welcome loungeFine
Signage player · BrightSign XT11455.01 Welcome loungeFine
Wall plate where a host plugs in a laptop (HDMI or USB-C); sends to the lounge screen over HDBaseT · Kramer WP-20CT5.01 Welcome loungeFine
HDBaseT receiver at the lounge screen · Kramer TP-580Rxr5.01 Welcome loungeFine
The day's briefings, at the door · Logitech Tap Scheduler5.01 Welcome loungeFine
Display · Samsung QM85C5.02 BoardroomFine
Display · Samsung QM85C5.02 BoardroomFine
Video codec · Poly Studio G625.02 BoardroomFine
PTZ camera facing the table · Poly Studio E605.02 BoardroomFine
Touch controller · Poly TC105.02 BoardroomFine
Microphone · Poly IP Ceiling Microphone5.02 BoardroomFine
Microphone · Poly IP Ceiling Microphone5.02 BoardroomFine
Amplifier · Kramer PA-240Z5.02 BoardroomFine
Loudspeaker · Kramer Galil 6-C5.02 BoardroomFine
Loudspeaker · Kramer Galil 6-C5.02 BoardroomFine
Loudspeaker · Kramer Galil 6-C5.02 BoardroomFine
Loudspeaker · Kramer Galil 6-C5.02 BoardroomFine
In-room network switch · Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD)5.02 BoardroomFine
HDBaseT transmitter: the laptop connection at the table · Kramer EXT3-C-XR-T5.02 BoardroomFine
HDBaseT receiver at the display wall · Kramer EXT3-POE-XR-R5.02 BoardroomFine
Scheduler panel · Logitech Tap Scheduler5.02 BoardroomFine
Display · LG 75UH5Q-E5.03 Demo zoneFine
Display · LG 75UH5Q-E5.03 Demo zoneFine
Video bar · Poly Studio X725.03 Demo zoneFine
Touch controller · Poly TC105.03 Demo zoneFine
HDBaseT transmitter: the demo machine at the bench · Kramer EXT3-C-XR-T5.03 Demo zoneFine
HDBaseT receiver at the display wall · Kramer EXT3-POE-XR-R5.03 Demo zoneFine
Scheduler panel · Logitech Tap Scheduler5.03 Demo zoneFine
Display · Samsung QM85C5.04 Briefing auditoriumFine
Display · Samsung QM85C5.04 Briefing auditoriumFine
Video codec · Poly Studio G625.04 Briefing auditoriumFine
Wide camera over the audience, for questions · Poly Studio E705.04 Briefing auditoriumFine
PTZ camera on the back wall, following the presenter · Poly Studio E605.04 Briefing auditoriumTo review Not reporting as often as it should
Touch controller · Poly TC105.04 Briefing auditoriumFine
Microphone · Poly IP Table Microphone5.04 Briefing auditoriumFine
Microphone · Poly IP Ceiling Microphone5.04 Briefing auditoriumFine
Microphone · Poly IP Ceiling Microphone5.04 Briefing auditoriumFine
Microphone · Poly IP Ceiling Microphone5.04 Briefing auditoriumFine
Microphone · Poly IP Ceiling Microphone5.04 Briefing auditoriumFine
Amplifier · Kramer PA-240Z5.04 Briefing auditoriumTo review Not reporting as often as it should
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
Loudspeaker · Kramer Galil 6-C5.04 Briefing auditoriumFine
In-room network switch · Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD)5.04 Briefing auditoriumFine
HDBaseT transmitter for each display, in the AV rack · Kramer TP-583TXR5.04 Briefing auditoriumFine
HDBaseT transmitter for each display, in the AV rack · Kramer TP-583TXR5.04 Briefing auditoriumFine
HDBaseT receiver at each display · Kramer TP-583RXR5.04 Briefing auditoriumFine
HDBaseT receiver at each display · Kramer TP-583RXR5.04 Briefing auditoriumFine
HDBaseT transmitter: the presenter's laptop connection · Kramer EXT3-C-XR-T5.04 Briefing auditoriumFine
HDBaseT receiver for the presenter's laptop · Kramer EXT3-POE-XR-R5.04 Briefing auditoriumFine
Scheduler panel · Logitech Tap Scheduler5.04 Briefing auditoriumFine
Monitoring display for the auditorium's programme and far end · Samsung QM65C5.05 Control roomFine
The operator's controller, paired with the auditorium's codec over the network · Poly TC105.05 Control roomFine

Who runs this service

Service owner

Service manager, AV

Sofia Reyes, with the on-site technician for each event

Every client, host and agenda on these pages is made up for the demo.

View as

See Keia Atlas the way someone else does. A demo: nobody signs in.

Viewing asAnna ByrneAV and IT delivery engineer · EMEA

Suggested

Delivery

  • Delivery engineerDesigns and commissions spaces, from survey to handover
  • Project managerRuns projects day to day: dates, suppliers and who does what
  • On-site technicianInstalls and fixes kit in the offices
  • Programme managerPlans the year of projects across every region
  • Engineering managerLeads the delivery engineers
  • Project management leadLeads the project managers
  • On-site services managerLeads the on-site technicians
  • Delivery managerThe whole delivery team, every region

Support and service

  • Service desk analystTakes incidents as they arrive and routes them
  • Network engineerPorts, VLANs and patching
  • Service manager, AVOwns the AV standard and its service
  • Service manager, networkOwns the network standard and its service

The Lab

  • Innovation engineerTests new kit before it ships

Leadership

  • Head of AV and ITThe whole service, every region

Partners

  • Integration vendorSees their own installations only
  • Service vendorRepairs under the service contract

Overview

  • EveryoneEvery role's first screen at once, to see the whole picture

Settings

Appearance
LookStudio
Text size
Default

Report

Tell the team

About Events and experience centres

Goes to Sofia Reyes, Service manager, AV. Reviewed within five working days.