Vendor access
This part is for Aigna staff
Vendors see their own installation and the device reference they need to build it: device types, setup guides and models. Everything else stays with Aigna.
Go to your installationModule
Services is switched off
The services the team runs, their health and their standard. This demo has the Services module switched off in Organisation settings.
Service map
Lit by health, following the filters- Internet circuits12 working
- Firewalls and gateways18 working
- Switches48 working
- Wi-Fi83 working
- Home gateways100 working
- Offices and homes onlineAV and every desk run on it
- UniFi Network · checked every 5 s
- UniFi Site Manager · checked every 5 s
- Switch and firewall management · checked every 5 s
- ServiceNow · checked every 5 s
The experience
Every office, last 30 days · counted per space, never per personNot working
Every item in this service is online, with no alerts.
See all in the item mapAlerts and changes
Nothing has happened here in the last hour.
Simulated from each item's kind and the open incidents, the same in every window. Access points are units in the open areas and corridors of each floor. Real feeds from UniFi and the switch management replace this with the same shape.
Health by office
Select one to filter by itEverything in the service
Each dot is an item. Hover to look, select to open it.OnlineAlert, or an open incidentOffline
No items match these filters.
Service levels
6 of 6 promises kept this month| Promise | Target | This month | Kept | Last 12 weeks |
|---|---|---|---|---|
| Response, P1 | 15 min | 1 of 1 this month | Kept | |
| Response, P2 | 1 h | 4 of 4 this month | Kept | |
| Fix, P1 | 4 h | 1 of 1 this month | Kept | |
| Fix, P2 | 8 h | 4 of 4 this month | Kept | |
| Fix, P3 | 3 days | 11 of 12 this month | Kept | |
| Offices online | 99.9% | 99.92% this month | Kept |
Measured from the incident records' own times, with no manual reporting: response is when someone had the job, fix is when it worked again. A promise is kept when nine in ten of the month's jobs met it. The results are simulated.
Firmware against the standard
Per model, following the filters above| Model | Kind | Units | Behind the standard | The standard | Advisories | Known errors |
|---|---|---|---|---|---|---|
| Ubiquiti U7 Pro | Wireless access point | 73 | 9 | Version not tracked yet | None | None |
| Ubiquiti UniFi Express 7 (UX7) | home-gateway | 100 | 0 | Version not tracked yet | None | 1 issue |
| adva-fsp150-ge114pro | circuit | 12 | 0 | Version not tracked yet | None | None |
| Corvus CS-3560P 24-port PoE Switch | In-room network switch | 7 | 0 | Version not tracked yet | None | None |
| Ubiquiti UniFi Switch Pro Max 48 PoE | In-room network switch | 7 | 0 | Version not tracked yet | None | None |
| Ubiquiti U7 Pro Max | Wireless access point | 6 | 0 | Version not tracked yet | None | None |
| cisco-c9800-l | wlc | 4 | 0 | Version not tracked yet | None | None |
| Netgear AV Line M4250-9G1F-PoE+ (GSM4210PD) | In-room network switch | 3 | 0 | Version not tracked yet | None | 1 issue |
| Corvus CS-2950 24-port Switch | In-room network switch | 2 | 0 | Version not tracked yet | None | None |
No model matches these filters.
Only the Poly line has release data, so other models name no versions. Which units run behind is simulated; a real device management feed replaces it with the same shape. Changes to the standard go through Proposals.
Incidents
1 open| Incident | Priority | Status | Space | Opened |
|---|---|---|---|---|
| INC0041198 Home office gateway keeps restarting, calls drop | P3 Moderate | On hold · ServiceNow: On Hold | Greystones home office 1, Remote EMEA | 2026-10-15 16:30 |
Open incidents raise an alert on their unit until they are resolved. Open the Incidents board for every service.
Changes and upcoming work
Projects that touch this service
- PRJ-14 Juneau office fit-outNew office · Deploy · Juneau office · run by Ruth Kelly · target 6 Nov 2026 · 9 open tasks
- PRJ-20 New starters' home offices, OctoberHome and remote kit · Deploy · Remote EMEA · run by Katya Novak · target 6 Nov 2026 · 8 open tasks
- PRJ-16 Dublin office IDF switch refreshComms room refresh · Procure · Dublin office · run by Ruth Kelly · target 1 Jan 2027 · 5 open tasks
- PRJ-19 Melbourne office IDF switch refreshComms room refresh · Procure · Melbourne office · run by Hana Mori · target 1 Jan 2027 · 4 open tasks
Tasks due in the next two weeks
- Commission Heron and fix the framing snagPRJ-14 · due 21 Oct · Anna Byrne
- Provision the four kits before they ship: asset records, device management and monitoring for each gatewayPRJ-20 · due 21 Oct · Anna Byrne
- Configure Wren's devices in their setup orderPRJ-14 · due 22 Oct · Sam Okafor
- Commission WrenPRJ-14 · due 23 Oct · Anna Byrne
- Printer on the network and in the print queuePRJ-14 · due 23 Oct · Anna Byrne
- Provision the flex desk docks and monitors in the asset registerPRJ-14 · due 26 Oct · Nora Walsh
And 11 more, in the Work list.
Stock and records
1 below minimum| Spare | Office | On the shelf | Where |
|---|---|---|---|
| Corvus CS-2950 24-port Switch | Juneau office | 0 of 1 minimum | IT store 2.10 |
Who runs this service
From the roles on the Team pageService owner
Service manager, IT infrastructure
- Owns
- Switches, VLANs and addressing. Comms rooms: the MDF and each IDF. ISP circuits
- Decides
- Network changes and port standards. Design sign-off for network
- Hands on to
- Network tasks go to the network engineer.
Hands on
Network engineer
- Owns
- Switch ports, VLANs and address reservations. Patching in the MDF and IDFs
- Decides
- Which port and VLAN a device gets
- Hands on to
- Works from tasks raised by projects and incidents.
Live figures come from: UniFi Network, UniFi Site Manager, Switch and firewall management. Today they are simulated.